Replace Exhaust Vent System
Active Release Competitive Sealed Bidding Illinois Awarded
- Contract number
- 27-416CMS-BOPM4-P-101447 Release 2
- Awardee
- Heartland Mechanical Contractors, LLC
- Contracting organization
- Robinson Correctional Center
- Contract amount
- $144,785
Award facts
- Completion date
- UNSPSC codes
- 72101511 Air conditioning installation or maintenance or repair service
- 72151005 Boiler pressure controller installation
- 72151006 Boiler pressure controller maintenance or repair or operation
- 72151207 Heating and cooling and air conditioning HVAC installation and maintenance service
- 72154102 Heat exchanger maintenance or repair service
- 72154110 Fin fan cooling tower maintenance and repair service
- 72154100 Distribution and conditioning system equipment maintenance and repair services
Award details come from bidbuy.illinois.gov. Updated .
About this award
Heartland Mechanical Contractors, LLC was awarded a competitive sealed bidding contract by Robinson Correctional Center in Robinson, Illinois for heating, ventilation, and air conditioning (HVAC) maintenance and installation services. The contract, valued at $144,784.60, has a performance period from September 1, 2026, through March 31, 2027. The work scope encompasses mechanical system upgrades and maintenance at the correctional facility, classified under UNSPSC codes for air conditioning installation and maintenance, boiler pressure controller services, and HVAC system installation and maintenance.
The specific deliverables include the replacement of two exhaust fans with associated ceiling demolition and reconstruction, disconnection and reconnection of ductwork, installation of ten new cook exhaust fans distributed across shower house facilities, provision of filter racks and filters for ongoing facility maintenance, fabrication and installation of necessary duct connection fittings, and installation of a 48 by 48 inch access door to facilitate future maintenance activities. The contract cost breakdown includes journeyman labor ($49,737.60), foreman labor ($48,632.00), exhaust fans ($37,500.00), access door ($5,265.00), and miscellaneous parts ($3,650.00), with payment terms providing for progress billing and a 1.5 percent monthly interest penalty on invoices remaining unpaid beyond thirty days.
Line items
| Item | Total |
|---|---|
| Region 9: Basic hourly labor rate Mon-Fri 8 am-5 pm for the fourth year. | $49,737.60 |
| Region 9: Foreman hourly labor rate Mon-Fri 8 am-5 pm for the fourth year. | $48,632.00 |
| Region 9: Materials at cost for repair for the fourth year. 5 Access Doors and 5 Exhaust Fans, Miscellaneous Parts (hangars, isolation brackets, rods, duct connections) Region 9: Materials at cost for repair for the fourth year. | $46,415.00 |
Files
| File | Type | Posted |
|---|---|---|
| Heartland Proposal 27RM045.pdf |
Quick answers
Who was awarded contract 27-416CMS-BOPM4-P-101447?
Contract 27-416CMS-BOPM4-P-101447 was awarded to Heartland Mechanical Contractors, LLC by Robinson Correctional Center in Illinois on September 1, 2026.
How much is contract 27-416CMS-BOPM4-P-101447 worth?
Its contract amount is $144,785.
On GovTribe
See this award's full record
- Every line item and file
- The contract it was ordered under and its other orders
- Similar state and local awards and opportunities
- Ask GovTribe AI about this award