REBID- DHS SP- Kiley Replace Sprinkler Heads - PIF
Ended Open Market Small Purchase Illinois Awarded
- Contract number
- 26-444DHS-DEVDI-P-97384
- Awardee
- Absolute Fire Protection, Inc.
- Contracting organization
- Developmental Disabilities
- Contract amount
- $35,675
Award facts
- Completion date
- UNSPSC codes
- 72101509 Fire protection system and equipment maintenance or repair service
- 73151702 Fire protection material treatment services
- 46171647 Flammable vapour detector
- 72101516 Fire extinguisher inspection maintenance and repair service
- 72151102 Fire sprinkler system installation service
- 72151103 Irrigation sprinkler system installation service
Award details come from bidbuy.illinois.gov. Updated .
About this award
Absolute Fire Protection, Inc. has been awarded an Open Market Small Purchase contract by the State of Illinois, Department of Developmental Disabilities, valued at $35,675.00 for the period of June 1, 2026 through June 30, 2026. The contract, identified as 26-444DHS-DEVDI-P-97384, encompasses a fire protection infrastructure improvement project involving the replacement of approximately 300 institutional sprinkler heads with Quick Response sprinkler heads across state facilities. The scope of work includes draining 10 sprinkler systems, removing existing institutional sprinkler heads, installing new Quick Response units, refilling each system, conducting leak inspections, and providing spare Quick Response sprinkler heads and sprinkler wrenches for ongoing maintenance.
The contractor must comply with applicable fire protection standards, including certification under National Fire Protection Association (NFPA) standards 13 and 25 for sprinkler system installation, inspection, testing, and maintenance. Additionally, Absolute Fire Protection, Inc. is required to maintain current licensing, bonding, and insurance coverage, and must adhere to Illinois prevailing wage requirements and the State's standard terms and conditions, including mandatory General Commercial Liability insurance of $1,000,000 per occurrence. The contractor is responsible for removing all construction debris and waste materials generated during the sprinkler head replacement operations, with completion of all work required by June 30, 2026.
Line items
| Item | Total |
|---|---|
| FY26 PIF Project to replace Approximately 300 Institutional Sprinkler Heads with Quick Response Sprinkler Heads--Drain 10 sprinkler systems.--Remove installed Institutional sprinkler heads.--Install new Quick Response (QR) sprinkler heads.--Refill each sprinkler system.--Conduct Inspection of each… | $35,675.00 |
Files
| File | Type | Posted |
|---|---|---|
| Vendors_Conference_QA-1.docx | DOCX document | |
| RMU150~39.docx | DOCX document | |
| Terms And Cond.pdf |
Quick answers
Who was awarded contract 26-444DHS-DEVDI-P-97384?
Contract 26-444DHS-DEVDI-P-97384 was awarded to Absolute Fire Protection, Inc. by Developmental Disabilities in Illinois on June 1, 2026.
How much is contract 26-444DHS-DEVDI-P-97384 worth?
Its contract amount is $35,675.
On GovTribe
See this award's full record
- Every line item and file
- The contract it was ordered under and its other orders
- Similar state and local awards and opportunities
- Ask GovTribe AI about this award