Well 5636-2 and 5684-1 Design Project

Closed State & local contract opportunity Posted

Solicitation number
2026-56
State
California
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Coachella Valley Water District is requesting proposals for engineering design services for the Well 5636-2 and Well 5684-1 Drilling and Construction Projects, with proposals due October 6, 2026 at 2:00 p.m. PDT. A remote pre-bid meeting is scheduled for September 15, 2026 at 10:00 a.m. PDT via Microsoft Teams (attendance optional), and questions are due September 25, 2026 at 5:00 p.m. PDT.

The scope encompasses full engineering support for two domestic water production wells and related facilities: project administration, management, and quality assurance/quality control; design plans and specifications for well drilling; construction support, specialty inspection, and hydrogeology support during drilling and testing; design of well pumping plants and domestic water pipeline connections; surveying, right-of-way review, and permit acquisition; utility research and potholing; geotechnical investigation; preparation of complete construction documents for bidding; and bid phase services.

The estimated contract value is $1 million on a lump-sum basis. The project start date is November 3, 2026, with a 400-day duration. No bid bond, payment bond, or performance bond is required. Proposals must be submitted electronically through the PlanetBids vendor portal. Inquiries should be directed to Glenn Lubbe at the Coachella Valley Water District Engineering Department, 75-515 Hovley Lane East, Palm Desert, California 92211.

Opportunity text

The Well 5636-2 and Well 5684-1 Drilling and Construction Projects consists of design, drilling, development, and pumping plant construction for two domestic water production wells and related facilities. Engineering services for the Well 5636-2 and Well 5684-1 Drilling and Construction Projects shall include: providing Project Administration, Management, and Quality Assurance/Quality Control; preparing design plans and specifications for drilling the new water productions wells (Well 5636-2 and Well 5684-1); construction support, specialty inspection, and hydrogeology support during drilling and testing; preparing design plans and specifications for the well pumping plants, domestic water pipeline connections; performing surveying, right-of-way review, and obtaining permits; performing utility research and utility potholing; performing Geotechnical Investigation; preparing complete construction documents for bidding; and providing bid phase services.

Files

File Type Posted
Well 5636-2 and 5684-1 Design Project.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity