Well 4 Facilities Upgrades

Open State & local contract opportunity Posted

Solicitation number
1698
State
California
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Huntington Beach Department of Public Works is requesting bids for comprehensive upgrades to Well 4, a groundwater facility discharging into the Peck Reservoir, under Invitation #CC 1698 with bids due July 21, 2026 at 10:00 a.m. PDT and a mandatory pre-bid meeting on June 23, 2026 at 9:00 a.m. PDT at 14621 Springdale Street.

The scope encompasses demolition and removal of the existing well pump building, foundation, field instruments, electrical systems, well tubing, and wellhead piping; installation of a new 75 horsepower well pump with tubing and wellhead modifications performed by a specialized well reconditioning subcontractor; construction of a new building with concrete foundation and slab; discharge steel fusion bonded epoxy lined pipe ranging from 6 to 12 inches in diameter; hydraulically controlled pressure sustaining valve with flow metering and monitoring; centrifugal liquid-solids separator; valves and field instruments; 480VAC electrical gear and pump variable frequency drive; and optional demolition of the Well 4 chlorine building. The City's controls configuration firm will handle programmable logic controller programming and configuration separate from the general contractor's work. The existing leased well pump, motor, and VFD are to be salvaged and removed by the leasing firm.

Award will be made on a lump sum basis to a single contractor. Bid bond is 10 percent; payment and performance bonds are each 100 percent. Liquidated damages are set at $3,000 per day. The estimated project start is June 22, 2026 with a four-month duration. Electronic bid submission is required through the PlanetBids vendor portal. Questions are due July 1, 2026 at 5:00 p.m. PDT. Contact Kyle Hilton at 714-536-5453 or kyle.hilton@surfcity-hb.org.

Opportunity text

2 versions

Update #2 · Latest ·

The upgrades to the existing Well 4 facility, which discharges ground water into the Peck Reservoir, includes the demolition and removal of the existing well pump building and foundation, field instruments, electrical, well tubing and wellhead piping. Removal of the existing leased well pump and appurtenances, motor and VFD are to be salvaged for the leasing firm who owns this equipment to pickup and remove these items from the site. Upgrades include a new 75 Hp well pump, tubing, well-head and modifications to be performed by a specialized well reconditioning firm performing as a subcontractor to the general contractor. Other work includes a new building, concrete foundation and slab, discharge steel fusion bonded epoxy lined pipe ranging in size between 6 and 12 in diameter, hydraulically controlled pressure sustaining valve with a flow metering and monitoring system, centrifugal liquid-solids separator, valves, field instruments & appurtenances, 480VAC electrical gear and pump VFD. PLCs and related programming are to be performed by the Citys controls configuration firm separate from the general contractors work. Demolition of the Well 4 chlorine building is an optional scope item as is installation of PLC-0004 either or both of which can be authorized by the City during the duration of the work.

Update #1 ·

The upgrades to the existing Well 4 facility, which discharges ground water into the Peck Reservoir, includes the demolition and removal of the existing well pump building and foundation, field instruments, electrical, well tubing and wellhead piping. Removal of the existing leased well pump and appurtenances, motor and VFD are to be salvaged for the leasing firm who owns this equipment to pickup and remove these items from the site. Upgrades include a new 75 Hp well pump, tubing, well-head and modifications to be performed by a specialized well reconditioning firm performing as a subcontractor to the general contractor. Other work includes a new building, concrete foundation and slab, discharge steel fusion bonded epoxy lined pipe ranging in size between 6 and 12 in diameter, hydraulically controlled pressure sustaining valve with a flow metering and monitoring system, centrifugal liquid-solids separator, valves, field instruments & appurtenances, 480VAC electrical gear and pump VFD. PLCs and related programming are to be performed by the Citys controls configuration firm separate from the general contractors work. Demolition of the Well 4 chlorine building is an optional scope item which can be authorized by the City during the duration of the work.

Files

File Type Posted
Well 4 Facilities Upgrades.pdf PDF
Well 4 Upgrades.pdf PDF