Wastewater Pipe & Maintenance Hole Relining FY 2025-2027
Closed State & local contract opportunity Posted
- Solicitation number
- CI 5532
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Gareth J. Madrid gmadrid@toaks.org (805) 449-2469
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Ventura County, California is soliciting bids on wastewater pipe and maintenance hole relining for fiscal years 2025–2027, with proposals due August 5, 2026.
The scope covers rehabilitation of approximately 19,060 linear feet of existing 6-inch to 15-inch diameter wastewater pipelines using cured-in-place pipe (CIPP) lining technology, installation of service lateral connections at selected locations, and polyurethane lining of 84 maintenance holes. The contractor must furnish all labor, materials, tools, equipment, and incidental items. Work includes installation and operation of temporary sewage bypass pumps and above-ground piping systems, safety measures, and traffic control. Comprehensive pricing for labor, materials, and equipment associated with all rehabilitation work is required.
The contract term spans fiscal years 2025–2027. Place of performance is Ventura County, California. The source does not specify an estimated contract value, evaluation criteria, a pre-bid meeting or site visit date, or a question-due date. No incumbent is identified.
Opportunity text
The work consists of furnishing all labor, materials, tools, equipment, and incidentals as required by the Specifications and Contract Documents. The general items of work include the rehabilitation of an estimated 19,060 feet of the existing 6-inch to 15-inch wastewater pipelines with cured-in-place pipe (CIPP) lining, including installation of temporary sewage bypass pumps and piping system (above ground), safety measures, traffic control, and all appurtenant work. The work also includes the installation of service lateral connections (SLC) at selected locations, as well as the rehabilitation of 84 maintenance holes with polyurethane lining.
Files
| File | Type | Posted |
|---|---|---|
| Wastewater Pipe _ Maintenance Hole Relining FY 2025-2027.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity