Wastewater Pipe _ Maintenance Hole Relining FY 2025-2027.pdf
PDF 124 MB Posted
- Solicitation number
- CI 5532
- Issued by
- Ventura County, California
About this file
This is a Scope of Work document for a wastewater infrastructure rehabilitation project in California spanning fiscal years 2025-2027. The project encompasses the rehabilitation of approximately 19,060 linear feet of existing 6-inch to 15-inch diameter wastewater pipelines using cured-in-place pipe (CIPP) lining technology, along with the installation of service lateral connections at selected locations and the rehabilitation of 84 maintenance holes with polyurethane lining. The work requires the contractor to furnish all labor, materials, tools, equipment, and incidental items necessary for project completion. Additional work components include the installation and operation of temporary sewage bypass pumps and above-ground piping systems, implementation of safety measures, and traffic control throughout the project duration. The contractor must be prepared to execute all appurtenant work associated with these main scope items.
The contract requires contractors to provide comprehensive pricing for all labor, materials, and equipment associated with the rehabilitation work. Specific pricing terms, set-aside provisions, incumbent information, funding sources, and budget allocations are detailed within the complete contract documents. The project timeline, milestone deadlines, and final completion requirements are established within the contract terms for the FY 2025-2027 period.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .