Upper Lever Roadway Improvement, Phase 3 at FLL
Closed State & local contract opportunity Posted
- Solicitation number
- PNC2132347C1
- State
- Florida
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Yohanna De Francisco ydefrancisco@broward.org (954) 357-6066
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Broward County Department of Aviation is soliciting bids for bridge maintenance and structural repairs at Fort Lauderdale-Hollywood International Airport's upper and lower roadway systems, with proposals due September 25, 2026.
The scope encompasses removal and replacement of bridge expansion joints, concrete spall repair, crack sealing, bridge jacking execution, and bridge bearing replacement across the roadway infrastructure in front of Terminals 2, 3, and 4. Work must maintain uninterrupted airport operations and continuous pedestrian and vehicular access throughout the project — a critical operational constraint requiring staged work and coordination with active terminal traffic. The contractor must furnish all labor, materials, equipment, and incidentals.
No estimated contract value, contract term, set-aside or preference program, evaluation criteria, incumbent information, or additional timeline details (question due date, pre-bid meeting, site visit) are provided in the solicitation notice.
Opportunity text
Scope of Work: Scope includes the furnishing of all labor, materials, equipment, services, incidentals required to perform essential bridge maintenance and structural repairs at Fort Lauderdale-Hollywood International Airport, an active airport facility. The project area is located along the upper and lower level of the airport roadway system, in front of Terminals 2, 3 and 4. Work includes removing and replacing bridge expansion joints, repairing concrete spalls, sealing cracks, preparing and executing a bridge jacking plan and replacing bridge bearings. Maintaining continuity of airport operations and ensuring uninterrupted pedestrian and vehicular access are critical requirements throughout the project.