Chester County Wastewater Recovery in South Carolina is soliciting sealed bids for construction of a 12-inch force main along Highway 9 to serve the Albemarle Site, with bids due August 12, 2026 at 2:00 p.m. The project is partially funded with Federal funds from the United States Department of Commerce Economic Development Administration and carries Davis-Bacon Act, Executive Order 11246 and 11375, and Title VI Civil Rights Act compliance requirements, including positive efforts to use small and minority-owned businesses as specified in 40 CFR 33.240.

Bidders must hold a WL classification under South Carolina Contractor's Licensing Law. The scope consists of approximately 13,578 linear feet of 12-inch C900 force main installed by open cut method, 180 linear feet of 12-inch DIP force main installed by open cut method, 300 linear feet of 14-inch HDPE installed by horizontal directional drill, 10 air release valves, and connections to existing pump station number 2 with appurtenances. All materials, equipment, and labor are the contractor's responsibility.

Bids must include security equal to not less than five percent of the bid amount in the form of a certified check or bid bond payable to the Owner. Bids may not be withdrawn within 90 days after opening. A non-mandatory pre-bid meeting will be held July 29, 2026 at 2:00 p.m. at Chester County Wastewater Recovery, 3261 Lancaster Highway, Richburg, SC 29729. Written questions are due August 5, 2026 and should be directed to the engineer, David Hunt, at david.hunt@aecom.com. Bidding documents are available through Duncan Parnell's online bid room at https://bidroom.duncan-parnell.com/; prospective bidders must register to obtain documents and be added to the Plan Holder's List. AECOM serves as the Engineer.

Opportunity text

The work to be done consists of furnishing all materials, equipment, and labor necessary to construct 12-Inch Force Main Along Hwy 9 To Serve Albemarle Site, consisting of the following approximate quantities: 13,578 LF 12-inch C900 Force Main installed by open cut method, 180 LF 12-inch DIP Force Main installed by open cut method, 300 LF of 14-inch HDPE installed by horizontal directional drill, 10 air release valves, connecting to existing pump station number 2 and appurtenances.