Downtown to Loop Pressure Zone (PZ) Conversion Project
Closed State & local contract opportunity Posted
- Solicitation number
- 26-0036
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Points of contact
-
- Purchasing purchasing@nbutexas.com (830) 608-8867
- Kim Robbins krobbins@sjra.net (936) 588-7118
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The San Jacinto River Authority (SJRA) is requesting qualifications-based responses for professional land surveying services on an on-call contract basis, with statements of qualifications due July 9, 2026 at 11:00 a.m. CT. Consultants must be sole proprietorships, partnerships, corporations, or other legal entities registered to do business in Texas with considerable experience providing professional land surveying services to governmental entities.
The scope encompasses topographic surveys, boundary surveys, hydrographic and bathymetric surveys, subsurface utility engineering (SUE), and construction surveying. Consultants may be required to perform site visits, document observations, participate in progress meetings, upload reports to Procore, and support quality assurance efforts.
The contract term is three years. SJRA reserves the right to solicit other consultants during this period, indicating this is not an exclusive-award vehicle.
A non-mandatory pre-submittal conference is scheduled for June 22, 2026 at 1:30 p.m. at the SJRA Woodlands Division in The Woodlands, Texas. The deadline for questions and inquiries is June 26, 2026 at 11:00 a.m. CT. Submissions are made through the Brazos Valley/Ionwave System and must include a Conflict of Interest Questionnaire, Statement of Qualifications, and Certification and Acknowledgment Form. An addendum is anticipated on July 1, 2026 if necessary. Reviews of submissions, finalist interviews or presentations, and shortlist finalization are anticipated during July and August 2026.
Contact: Kim Robbins, Senior Buyer, San Jacinto River Authority, 1577 Dam Site Road, Conroe, TX 77304, (936) 588-7118, krobbins@sjra.net.
Opportunity text
2 versions
Update #2 · Latest ·
New Braunfels Utilities (NBU) invites the submittal of responses to this Request for Proposals (RFP) from qualified firms interested in providing construction services in connection with the construction of Downtown to Loop PZ Conversion (the Project). The Project has been designed by Parkhill, Inc. The Project includes the following items within its scope: (i) construction of approximately 5,700 linear feet (LF) of 8-inch to 12-inch watermain piping by open cut and trenchless methods; (ii) pressure reducing valve (PRV); (iii) groutfill abandonment of existing piping; (iv) traffic control; (v) storm water pollution prevention; (vi) restoration; and (vii) all other appurtenances necessary to complete the Project.
Update #1 ·
The San Jacinto River Authority (SJRA) is requesting qualifications based responses to contract with Professional Consultant(s) (Consultant), which must be a sole proprietorship, partnership, corporation, or other legal entity registered to do business in the State of Texas with considerable experience in providing Professional Land Surveying Services for governmental entities.
Files
| File | Type | Posted |
|---|---|---|
| 26-0036_Dowtown_to_Loop_PZ_Conversion_Project.pdf | ||
| Bid Invitation (6).pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity