SR 3023 over Roaring Brook Bridge Reconstruction

Closed State & local contract opportunity Posted

Solicitation number
67199
State
Pennsylvania
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Pennsylvania Department of Transportation (PennDOT) is soliciting bids for superstructure replacement on two bridges carrying State Route 3023 and State Route 8025 over Roaring Brook and bridge preservation work on SR 8025 over President Biden Expressway Ramp D in Lackawanna County, with bids due August 13, 2026 at 11:00 a.m. Prequalification is required. The project is federally funded and subject to Buy America, Build America, and FHWA requirements.

The scope encompasses a single-span Composite P/S Concrete Spread Box Beam superstructure and a four-span P/S concrete spread PA Bulb-Tee Beam superstructure, along with roadway approach pavement reconstruction, shoulder widening, guide rail replacement, erosion and sediment control measures, temporary traffic control, signing, pavement marking, partial structure removal, and miscellaneous construction work. Work locations span SR 3023 Section D50 and SR 8025 Sections 250 and PRS within the City of Scranton, covering 1,572.12 feet (0.298 miles) total. The bid package includes approximately 200 line items with quantities ranging from 1 to 21,452 units.

Estimated contract value is between $15 million and $19.999 million. The Notice to Proceed is anticipated September 28, 2026, with required project completion by September 21, 2032. Construction uses staged construction with specific completion milestones for each stage spanning from June 14, 2027 through July 19, 2032. Work is prohibited during winter shutdown periods from the Tuesday before Thanksgiving through March 31, except for tree trimming and removal. The contract includes Road User Liquidated Damages assessments and mandates continuous construction operations with active staffing and material availability. Contractors must maintain pedestrian access on SR 8025 over Ramp D throughout construction and coordinate with utilities through PA One Call.

Opportunity text

The project involves the superstructure replacement for two (2) structures carrying SR 3023 and SR 8025 traffic over Roaring Brook and bridge preservation work on the SR 8025 structure over President Biden Expressway Ramp D along with approach roadway improvements. Replacement superstructures include a single span Composite P/S Concrete Spread Box Beam and a four (4) span P/S concrete spread PA Bulb-Tee Beam superstructure. Other work includes roadway approach pavement reconstruction and shoulder widening, guide rail replacement, E & S control measures, temporary traffic control, signing and pavement marking, partial structure removal, and other miscellaneous construction work. Construction of the bridges will be completed using staged construction as well as while traffic is detoured as indicated on the approved drawings included in the bid package for State Route 3023, Section D50 in Lackawanna County, City Of Scranton from a point approximately 0.4 mile north of Birch St at Segment 0060 Offset 0298 to a point 0.2 miles south of President Biden Expressway at Segment 0060 Offset 1088 AND State Route 8025, Section 250 in Lackawanna County, City Of Scranton from a point approximately 0.2 miles south of Mulberry St at Segment 0500 Offset 0000 to a point approximately 0.5 miles north of Birch St at Segment 0500 Offset 0688 and State Route 8025, Section PRS in Lackawanna County, City Of Scranton from a point approximately 0.2 miles south of Jefferson Ave. at Segment 0500 Offset 0494 to a point approximately 0.5 miles north of Birch St at Segment 0500 Offset 0688 with a total work area length of 1572.12 feet (0.298 miles).