Midtown Park Bathrooms Utility Installation and Hook Up

Open State & local contract opportunity Posted

Solicitation number
27-002 Addendum 1
State
Texas
Responses due

Opportunity facts

Jurisdictions
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Galena Park Consolidated Independent School District (GCCISD) is soliciting proposals for solid waste management services with a proposal deadline of June 5, 2026 at 2:00 p.m. Central Time.

The solicitation covers comprehensive solid waste management services to support district operations across multiple locations in Harris County and Austin, Texas. Specific service volumes, collection frequencies, and detailed scope requirements are outlined in the complete bid documents, which prospective bidders must review to confirm compliance with district procurement procedures.

Contract duration and renewal options will be determined based on GCCISD's needs and the selected contractor's proposal. Award decisions will follow the submission deadline and evaluation period.

Opportunity text

2 versions

Update #2 · Latest ·

The city anticipates the scope of work for the Project to consist of the following responsibilities and the following items following items as reflected in the GLS Construction Plans dated 9/26/26: Prepare site for City of Bryan purchased prefabricated restrooms in Midtown Park at the Legacy Playground and the northwest corner of the park as shown as Area A and Area B on the GLS Construction Plans. The restrooms are being purchased from CXT, Inc, Hillsboro Texas. Both restrooms will be delivered to midtown park and set in-place by CXT, Inc. Delivery date is TBD. When CXT, Inc. delivers the prefab units, all tie-in to the units utilities must be made that day and CXT, Inc. will operate all functions of the restrooms before they leave. This RFP response pricing will include the connections to the restrooms when they are delivered. Reference drawing set DK4-065- ST-PRINT-REV-1 that is part of this RFP for Area A and CR-2018-ST-Print-Rev-0 for Area B restroom. Utility services to the two restrooms require water, sewer and electricity and must be stubbed up with-in the building foot print per the drawings DK4-065-ST-PRINT-REV-1 and CR-2018- ST-Print-Rev-0. Tree protection must be observed per the attached drawing TPD-19. The foundations for the restrooms are essentially the combination of the compacted sub-base material and the buildings reinforced slab. The pricing for the compacted sub-base material must be included in RFP. Flatwork around bathroom area A will have to be poured after the restroom buildings are set in-place and tied to the utilities. Sidewalk additions to be made per the bid documents. Flatwork to be doweled into foundation of the restrooms as required. Project Lighting is shown on the GLS Construction Plans around the perimeter of the Legacy Playground and ceiling/flood lighting in the pavilions. Restroom Additions Sidewalk Additions Utility Services Lighting Additions The Project will be designed and constructed so as to meet all applicable federal, state, and local accessibility standards.

Update #1 ·

GCCISD is accepting proposals forSolid Waste Management Services.

Files

File Type Posted
RFP 27-002 Midtown Park Bathrooms.pdf PDF
Bid Invitation (20).pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity