SMART Overlay and Designed Overlay, HMA Surface Removal and Resurfacing Improvements
Closed State & local contract opportunity Posted
- Solicitation number
- 80C95
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- IDOT Contracts Office dot.de-contracts@illinois.gov (217) 782-7806
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Illinois Department of Transportation is soliciting bids for pavement preservation and ADA improvements along Illinois Route 113 (Main Street) in Braidwood, Will County, under Contract 80C95, with electronic bids due September 18, 2026 at 12:00 p.m. The project is funded through Federal-aid construction funds and requires DBE participation compliance.
The scope spans 6,044 feet (1.14 miles) with a 300-foot omission and includes SMART Overlay and Designed Overlay resurfacing, hot-mix asphalt surface removal and replacement with HMA binder and surface courses, longitudinal joint sealing, curb and gutter removal and replacement, drainage structure adjustments and cleaning, thermoplastic pavement markings, detector loop replacement, curb ramps and ADA improvements, raised reflective pavement markers, and minor traffic signal improvements including accessible pedestrian signals. Utility coordination is required for Nicor Gas and AT&T communication equipment located between stations 15+40 and 78+80.
Contractor qualifications include current IMSA/IPSI Traffic Signal Technician Level II certification for signal work and personnel holding appropriate Hot-Mix Asphalt technician certifications. An Engineer's Field Office Type A (D1) with specified dimensions and amenities is required. Contractors must maintain existing traffic signal installations during construction with one-hour response time for emergency repairs and comply with Federal and State law, including EEO requirements and recurring special provisions.
The contract will be awarded to the lowest responsive and responsible bidder. Bids must be submitted electronically to the iCX system. IDOT reserves the right to determine responsibility at time of award, reject any or all proposals, re-advertise, and waive technicalities.
Opportunity text
This is a pavement preservation (SMART Overlay up to the omission and Designed Overlay for the rest of the project) and curb ramps for sidewalks (ADA) improvements project. The work to be performed under this contract includes pavement patches, hot-mix asphalt (HMA) surface removal, resurfacing with HMA binder and surface course, longitudinal joint sealing, curb and gutter removal and replacement, drainage structures adjustments and cleaning, new thermoplastic pavement markings, detector loops replacement, curb ramps for sidewalk (ADA) improvements, installation of raised reflective pavement markers, and minor traffic signal improvements (installation of accessible pedestrian signals - APS) and all incidental and collateral work necessary to complete the project as shown in the plans and as described herein. Location: The project extends along IL 113 (Main St.) in the east direction for 6,044 feet (1.14 miles), not including an approximately 300-foot omission beginning just before IL 129 (Washington St.) and extending to just before IL 53 (Front St.). The project is located within the City of Braidwood.
Files
| File | Type | Posted |
|---|---|---|
| ILDOT 80C95-012.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity