About this opportunity
Chittenden County, Vermont is soliciting bids for improvements to the water system at Shady Pines Mobile Home Park, with proposals due September 14, 2026.
The base scope replaces a 40-year-old 6,000-gallon steel pressure storage tank with two 4,000-gallon buried fiberglass storage tanks; installs a new 95 GPM dual-alternating self-priming booster pump system to pressurize the distribution network; and extends the 1.5-inch PVC well supply line 45 feet with two buried shut-off valves and 30 feet of 3-inch PVC suction line from the new tank to the booster pump system.
Add/Alternate services include replacing approximately 1,300 linear feet of aged 1.5-inch and 2-inch water mains with 3-inch HDPE water main in the southern distribution system; constructing a flushing hydrant for uni-directional flushing; and replacing approximately 525 linear feet of existing 0.5-inch and 0.75-inch water service lines with 0.75-inch HDPE water pipe and individual shut-off valves in the southern distribution system.
The posted government file attachment (ShadyPinesMHPWater7_27_26.pdf) could not be accessed, and the source does not provide contract value, contract term, place of performance, evaluation criteria, set-asides or preferences, a pre-bid meeting or site visit date, or a question deadline.
Opportunity text
A. The project proposes the following work to the water system: • Replacement of the existing 40+ years old 6,000 gallon steel pressure storage tank with 2: 4,000 gallon buried fiberglass storage tanks. • Construction of a new 95 GPM dual-alternating self-priming booster pump system to pressurize the mobile home park distribution system. The existing 6,000 gallon steel pressure tank is pressurized by the 30 gpm well pump. • Construction of a 45 ft extension on the 1.5" PVC well supply line with two buried shut-off valves from the existing water building to the new water tanks. • Construction of 30 ft of 3" PVC suction line from the new water tank to the interior booster pump system. B. The project also proposes the following work to the water distribution system as Add/Alt services: • Replacing 1,300 ft of existing 1.5 in and 2 in aged water mains of various types with a 3 in HDPE water main in the southern distribution system. • Construction of a flushing hydrant on the new southern distribution system main to permit uni-directional flushing. • Replacing 525 ft of existing 0.5 in and 3/4 in water services of various types with 3/4 in HDPE water pipe and individual shut-off valves in the southern distribution system.
Files
| File | Type | Posted |
|---|---|---|
| ShadyPinesMHPWater7_27_26.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity