Shadow Mountain Water System Project (Water Main and Booster Pump Station)
Closed State & local contract opportunity Posted
- Solicitation number
- 95052
- State
- Washington
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Clark County, Washington is soliciting bids for the Shadow Mountain Water System Project, a water main and booster pump station construction contract with proposals due September 28, 2026.
The scope includes installation of approximately 64 linear feet of 12-inch-diameter water main, 1,140 linear feet of 8-inch-diameter water main, and approximately 694 linear feet of 4-inch-diameter future reservoir fill line. Work encompasses mechanical improvements, electrical and controls installation for a County-provided booster pump station, domestic service connections, and fire hydrants. The water mains will be installed from an existing reservoir north of the high school along a proposed easement east of the existing property line, through the existing roadway and utilities easement, and terminate at Halo Rim Drive, with additional 8-inch mains installed along existing development roadway and utilities easements.
No estimated contract value, contract term, set-aside or preference program, evaluation criteria, or procurement timeline detail beyond the proposal due date is provided in the available source material.
Opportunity text
Construction of the water mains will include approximately 64 linear feet (LF) of 12 diameter water main, 1,140 linear feet of 8-inch-diameter water main and approximately 694 LF of 4- inch-diameter future reservoir fill line. Installation, connection, mechanical improvements, electrical and controls for County provided booster pump station. There will be domestic service connections and fire hydrants. The 4 mains will be installed from the existing reservoir, located just to the north of the high school, along a proposed easement just east of the existing property line and then within the existing roadway and utilities easement and terminate at Halo Rim Drive. The 8 water mains will be installed along existing development roadway and utilities easements.