452487.pdf
PDF 255 KB Posted
- Solicitation number
- 95052
- Issued by
- Clark County, Washington
About this file
This file is a legal notice publication page from the Daily Journal of Commerce, a business publication serving the Seattle, Washington area since 1893. The document serves as a medium for publishing state and local contract opportunities, legal notices, and business announcements for government agencies and organizations in Washington State.
The specific contract opportunity referenced involves the Shadow Mountain Water System Project in Washington, which includes construction of water mains and a booster pump station. The project scope encompasses installation of approximately 64 linear feet of 12-inch-diameter water main, 1,140 linear feet of 8-inch-diameter water main, and approximately 694 linear feet of 4-inch-diameter future reservoir fill line. The construction also includes installation, connection, and mechanical improvements for a County-provided booster pump station, along with electrical and controls work, domestic service connections, and fire hydrants. The water mains will be installed from an existing reservoir located north of the high school, extending along a proposed easement east of the existing property line, through the existing roadway and utilities easement, and terminating at Halo Rim Drive, with additional 8-inch water mains installed along existing development roadway and utilities easements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
“Helping business do business since 1893”
83 Columbia St., Seattle, WA 98104 • P.O.Box 11050, Seattle, WA 98111 • www.djc.com
Phone (206) 622-8272 • Fax (206)-622-8416 • legals@djc.com
File details come from the government source that posted it. Updated .