Sandlewood Electric Reconstruction Project
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66751-NONST-2025-000000037
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 95121800 Utility buildings and structures
- 72141110 Oil and gas branch line construction service
- 72141111 Gas main construction service
- 72141112 Natural gas compressor station construction service
- 72141113 Oil and gas pipeline construction service
- 72141114 Pipeline wrapping service
- 72141126 Underground utilities construction service
- 95121803 Nuclear power station
- 95121802 Substation
- 95121641 Pumping station
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
This state and local contracting opportunity is for the Sandlewood Electric Reconstruction Project in Crisp County, Georgia. The work consists of installing a new single-phase underground loop through an existing neighborhood to replace the current primary cable that runs through the backyards. The project involves the installation of new primary cable, transformers, secondary cable, and other related infrastructure. Sealed bids will be received until 3:00 PM on October 7, 2024, and a mandatory pre-bid conference is scheduled for September 18, 2024. The contract will be awarded to the bidder submitting the lowest responsive and responsible bid, and the work must be completed within 140 consecutive calendar days. Bidders must meet specific requirements regarding experience, equipment, and financial capability. The bid requires a 5% bid bond, and the successful contractor will be required to provide 100% payment and performance bonds. All materials will be provided by the City, but the contractor is responsible for labor, equipment, traffic control, and restoration of any damages. Liquidated damages of $100 per day will be assessed for failure to complete the work on time.
The contracting opportunity does not mention any set-aside designations or restrictions on the types of organizations that can respond. Additionally, the documents do not list any incumbent vendors or current contractors, nor do they provide information on any existing infrastructure or technology that requires integration. The total award value or budget range is also not specified in the provided materials.
Opportunity text
This work will consist of installing a new single-phase underground loop through an existing neighborhood. The current primary cable feeds through the backyards of the development, with many secondary cables going from the transformers in the backyards to the meter bases on the back of the townhomes.
Files
| File | Type | Posted |
|---|---|---|
| SB010_25Inv.pdf | ||
| SB010_25 Drawing.pdf | ||
| SB010_25add1.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity