The provided document is an addendum to Solicitation SB010 issued by the state of Georgia for the Sandlewood Electric Reconstruction Project in Crisp County. This addendum revises the scope of work for the project, which involves installing a new single-phase underground loop through an existing neighborhood to replace the current primary cable that runs through the backyards of the development. The addendum provides additional details on the project, including the requirement for the successful bidder to attend a mandatory pre-bid conference on a specified date. The contract will be awarded to the lowest responsive and responsible bidder, and the term of the contract is not specified.
The addendum does not provide any information on pricing terms, set asides, incumbents, funding requirements, or other salient details. It focuses solely on revising the scope of work and providing logistical information related to the pre-bid conference.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SB010_25 Drawing.pdf | ||
| SB010_25Inv.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
September 26, 2024
ADDENDUM #1
SB010-25
Sandlewood Electric Reconstruction Project
Please see the clarifications below:
Replace: bidding form Pages 11-12 with the attached bidding form Pages 11R1-12R1.
Attached are two maps showing the existing infrastructure.
This addendum should be acknowledged in your bid. Failure to do so may result in your bid being deemed non-responsive.
Steve Murray Steve Murray Purchasing Director
SB010-25 Page 11R1
BIDDING FORM
Bidder submits the following lump sum/unit prices for the Sandlewood Electric Reconstruction Project identified in Bid Form as part of this Bid. Failure to utilize and return this form as a part of the bidding documents may result in rejection of bid.
ITEM#
ITEM DESCRIPTION
QTY
UNIT
UNIT
PRICE
TOTAL
AMOUNT
1 WARRANTY AND BONDS 1 LS
2 MOBILIZATION 1 LS
3 TRAFFIC CONTROL 1 LS
4 INSTALLATION OF 1/O U.G.
PRIMARY 4625 LF
5 INSTALLATION OF 2"
CONDUIT FOR (PRIMARY) 4209 LF
INSTALLATION OF (2) 2"
CONDUITS ACROSS THE
DAM PER C.O.L.
INSTRUCTIONS. (1 IS A
SPARE)
832 LF
INSTALLATION OF 2"
CONDUIT FOR (1/0
SERVICES)
5000 LF
INSTALLATION OF 1/0
TRIPLEX FROM UV-4 TO
METER
5000 LF
9 INSTALLATION OF 2"
CONDUIT FOR (# 6 DUPLEX) 2714 LF
INSTALLATION OF # 6
DUPLEX FOR STREET
LIGHTS
2714 LF
11 INSTALLATION OF 3"
CONDUIT FOR (350 TRIPLEX) 3500 LF
INSATLLATION OF 350
TRIPLEX FROM XFMR TO
UV-4
3500 LF
INSTALL SINGLE PHASE
TRANSFORMERS (25-75KVA)
WITH CONCRETE PADS AND
GROUNDING ASSEMBLY
15 EA
14 PRIMARY CABLE
TERMINATION 30 EA
SB010-25 Page 12R1
INSTALL UV-4 PEDESTAL
WITH GROUNDING
ASSEMBLY PER C.O.L. SPEC.
27 EA
16 INSTALL UV-2 BOXES AT
EXISTING LIGHT POLES 26 EA
INSTALL TOWN AND
COUNTRY LIGHTS (20') D.
BURY
3 EA
INSTALL (UM-2) OVERHEAD
TO UNDERGROUND SINGLE
PHASE TERMINATIONS
(RISER POLES)
2 EA
19 REMOVE (UM-2) FROM
EXISTING RISER POLES 6 EA
20 REMOVE EXISTING
TRANSFORMERS 28 EA
TOTAL
Optional Variable Quantity Line Items
21 ADD FOR ROCK BORE 500 LF
22 ADD FOR BLAST/HAMMER
ROCK 300 LF
23 INSTALL UV-2 SPLICE BOX
@ METER LOCATIONS 30 EA
24 CUT CONCRETE AND
REPAIR @ METER LOCATION 30 EA
25 INSTALL 2" HUB AND PIPE @
METER LOCATION 100 EA
TOTAL WITH OPTIONS $
The Work shall be completed within 140 consecutive calendar days.
Amounts are to be shown in numbers only. It is understood; that the estimated quantities in the Bid Proposal are approximate and are used only for comparison of bids, and are subject to increase or decrease as required to properly complete the Contract work. Low bidder shall be determined on the basis of the TOTAL BID PRICE. Furthermore, the Contractor shall be responsible for including all items required to perform the project as indicated on the plans and specifications and including all costs into the most appropriate unit prices, if not explicitly described in the Payment paragraph of each section.