Roof Replacement - Slater-Marietta Gym

Closed State & local contract opportunity Posted

Solicitation number
127-3
State
South Carolina
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The School District of Greenville County, South Carolina is requesting bids for roof replacement at Slater-Marietta Elementary School (100 Baker Circle, Marietta) covering 11,970 square feet across three roof areas, with bids due August 18, 2026 at 10:00 a.m. and a mandatory pre-bid conference on August 7 at 10:00 a.m. The general contractor must hire a Greenville County Schools pre-qualified roofing contractor to perform the roofing installation work.

The scope requires removal of existing modified bitumen roofing systems and wood plank decks, installation of new 60-mil TPO single-ply membranes with polyisocyanurate insulation, replacement of metal flashings and accessories, installation of new gutters and downspouts, and repair or replacement of damaged structural members including trusses and purlins across the barrel-vaulted and two adjacent flat roof areas. Lead-based paint has been detected on existing roof trusses in the barrel-vaulted area; the contractor is solely responsible for safe handling, containment, and disposal of lead-contaminated debris in compliance with OSHA, South Carolina Department of Environmental Services, and EPA regulations. The contractor must hold a valid South Carolina General Contractor's License and provide a manufacturer's 20-year no-dollar-limit warranty on the TPO system and a 5-year contractor's warranty.

Pricing must include unit prices for three allowances: wood blocking replacement (500 board feet in base bid), wood plank deck replacement (1,000 board feet for the two flat roof areas), and a $50,000 owner's contingency. Project completion is required by February 28, 2027 (181 calendar days from award). Liquidated damages are $1,000 per day after the completion date. Five percent bid security and performance and payment bonds are required. Pricing must remain firm for 60 calendar days. The inquiry deadline is August 11, 2026 at 10:00 a.m. Contract award is effective after an eight-day protest period.

Opportunity text

roof of the building has an exposed, barrel-vaulted, wood plank roof deck along with wooden structural trusses and purlins. The two roof areas flanking the barrel-vaulted roof have flat wood plank roof decks. The total square footage of the roof areas is 11,970 square feet. The existing, modified, roof system along with the existing wood plank roof deck is to be removed on the barrel-vaulted roof area. A new an exposed, barrel-vaulted, wood plank roof deck along with new roof system to be installed with a 60mil TPO single membrane. Damaged trusses and purlins and other structural members are to be repaired or replaced during this time. At the two adjacent roof areas, the existing, modified, roof systems are to be removed down to wood plank deck. New roof system and 60mil TPO to be installed. The General Contractor is to hire a Greenville County Schools Pre-Qualified Roofing Contractor to perform the roofing installation. A recent environmental analysis has detected the presence of Lead-Based Paint (LBP) on the existing roof trusses within the barrel-vaulted roof area. Full abatement of LBP is not required as a part of the primary scope of work. The General Contractor is advised that the removal and replacement of the roof decking will result in the incidental disturbance of the LBP on the bearing surfaces of the roof trusses. The Contractor is solely responsible for the safe handling, containment, and disposal of any lead-contaminated debris (e.g., paint chips, dust) generated during the demolition and installation processes.

Files

File Type Posted
Slater-Marietta Gym Roof Replacement Project.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity