About this opportunity
The City of La Center, Washington is requesting proposals for engineering services providing complete project management and inspection for the Pacific Highway Shared Use Path construction project, with proposals due July 27, 2026. A 10% voluntary Small Business Enterprise goal applies to the consultant agreement.
The scope includes project management and inspection throughout the construction phase, public presentation support to City Council, and closeout assistance. The consultant must ensure compliance with FHWA and WSDOT requirements for the federally and state-funded project. The work encompasses a 10-foot-wide concrete shared use path approximately 1,900 lineal feet in length between Larsen Drive and the existing sidewalk at Kays Subdivision, including roadside ditch regrading and a gravity wall above Jenny Creek at road grade to allow path construction behind the existing guardrail. All construction work must meet FHWA Buy America and Build America Buy America requirements per 23 CFR 635.410 and 2 CFR 184, with a maximum allowable dollar amount for foreign materials.
The project is funded through the Transportation Improvement Board, federal Carbon Reduction on Transportation Alternative funds, and state Move Ahead Washington funding. The consultant agreement extends through the full length of the construction project and closeout. Contract value, contract term duration, and evaluation criteria are not specified in the available source material.
Opportunity text
Consulting services will include but may not be limited to: ~ Providing Complete Project Management and Inspection Services during Construction. ~ Assist the City with public presentations to City Council. ~ Provide services to comply with FHWA and WSDOT requirements for federally funded and state funded projects. The construction phase must meet FHWA requirements during the length of the construction project. This project also has Transportation Improvement Board (TIB) funding and federal funding from Carbon Reduction on Transportation Alternative. There is also state funding from Move Ahead Washington (MAWA). The construction contract has FHWA Buy America and Build America Buy America requirements per 23 CFR 635.410 and 2 CFR 184, with a maximum dollar amount of foreign material allowed. The improvements include construction of a 10-feet wide concrete shared use path between Larsen Drive and the existing sidewalk at Kays Subdivision. The length of the project is approximately 1,900 lineal feed and includes regrading the roadside ditch between the existing road and the new path. A gravity wall will be built above Jenny Creek at the road grade, which will allow the path to be constructed behind the existing guardrail. The selected firm will provide all project management and inspection through the length of construction project, including closeout assistance per WSDOT/FHWA. A 10% voluntary SBE goal is included in this consultant agreement.