RFP - US 80 Corridor Study Phase II
Closed State & local contract opportunity Posted
- Solicitation number
- PE-62550-NONST-2025-000000001
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 90664 Planning, Urban (Community, Regional, Area Wide, And State)
- 91892 Urban Planning Consulting
- 91894 Traffic Consulting
- 91896 Transportation Consulting
- 92517 Civil Engineering
- 92561 Land Development And Planning/Engineering
- 92593 Traffic And Transportation Engineering
- 96194 Zoning, Land Use Studies
- UNSPSC codes
- 81101500 Civil engineering
- 81101523 Urban design and engineering service
- 81102202 Urban transport network
- 81102203 Inland waterways
- 93142000 Urban development
- 93142100 Regional development
- 81101522 Earthworks engineering
- 81101524 City development planning service
- 78142200 Aviation-Related services and consultancy
- 81101525 Sediment control engineering
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The Chatham County Savannah Metropolitan Planning Commission (MPC), acting on behalf of the Coastal Region Metropolitan Planning Organization (CORE MPO) and Effingham County, is seeking engineering design consultant services for the SR 26/US 80 Corridor Study Phase II. This Request for Proposals (RFP No. 2024-01) seeks a comprehensive study evaluating the existing and future capacity, operations, and safety conditions of the US 80 corridor from the Ogeechee River to the Effingham County/Chatham County line. The project requires analyzing updated traffic counts, projections, and crash data to assess corridor operations, with a specific focus on access management and capacity improvements. Key deliverables include prioritized recommendations for short-term (0-5 years), mid-term (6-10 years), and long-term (10+ years) improvements that will be incorporated into the CORE MPO Metropolitan Transportation Plan and Transportation Improvement Program. Proposals are due January 24, 2025, by 5:00 PM Eastern, with consultant selection expected by March 21, 2025, and a project start date of April 1, 2025. The study must consider freight, commuter, and local traffic, as well as pedestrian and bicycle transportation, with specific attention to growth from the Hyundai Metaplant and Port of Savannah. Evaluation criteria include demonstration of knowledge/experience (40%), understanding of scope (40%), ability to meet schedule (10%), and DBE commitment (10%).
The procurement requires GDOT pre-qualified firms and includes a 16% Disadvantaged Business Enterprise (DBE) participation goal aligned with GDOT's agency-wide target. The project budget is estimated at $270,000 and is contingent upon MPC receiving adequate funding from the Georgia Department of Transportation. Only consultants pre-qualified by GDOT may submit proposals, which must demonstrate compliance with DBE participation requirements. The study will comprehensively address transportation needs, considering the corridor's critical role in supporting regional economic development, particularly in light of anticipated growth from the Hyundai Metaplant and Port of Savannah. Proposers must show expertise in traffic analysis, transportation planning, and corridor improvement strategies. The ultimate goal is to develop a strategic plan that ensures the US 80 corridor can effectively manage current and future transportation demands while improving overall safety and operational efficiency.
Opportunity text
The Chatham County ¿ Savannah Metropolitan Planning Commission (MPC) on behalf of the Coastal Region Metropolitan Planning Organization (CORE MPO) and Effingham County is requesting proposals to provide Engineering Design Consultant Services for the SR 26/US 80 CORRIDOR STUDY, PHASE II FROM THE BRYAN COUNTY/EFFINGHAM COUNTY LINE (OGEECHEE RIVER) TO THE EFFINGHAM COUNTY/CHATHAM COUNTY LINE. The Study will evaluate the existing and future capacity, operations, and safety conditions of the corridor from its western terminus at the Ogeechee River (i.e., Bryan County/Effingham County line) eastwards to the Effingham County/Chatham County line. Updated traffic counts and projections will be obtained throughout the corridor, as well as crash data. This data will be used to evaluate the operations and safety of the corridor with strong consideration given to access management and capacity improvements that will improve the operations and safety. The Study will consider freight, commuter, and local traffic as well as pedestrians and bicyclists. The Study will account for anticipated continued growth associated with the development of the Hyundai Metaplant and at the Port of Savannah. The goal of the Study will be to identify and prioritize short-, mid- and long-term improvements needed for the corridor to operate at an acceptable level of service and provide prioritization of the required improvements to facilitate planning and programming of projects through the CORE MPO Metropolitan Transportation Plan (MTP) and Transportation Improvement Program (TIP) process. If interested in receiving a complete copy of the RFP specifications, please go to our website at https://www.thempc.org/Core/RFP2025.
Files
| File | Type | Posted |
|---|---|---|
| US80 Corridor Study Phase II RFP_12_20_2024.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity