Remodel Downtown Library

Closed State & local contract opportunity Posted

Solicitation number
26-035
State
Louisiana
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Shreve Memorial Library is soliciting bids for a remodel of its Downtown Branch facility at 424 Texas Street in Shreveport, Louisiana, with bids due July 2, 2026. The project encompasses interior and exterior renovation of the 1st, 2nd, and basement levels of the existing 4-story historic building and is a single prime contract with substantial completion required in 270 consecutive days.

Interior scope includes terrazzo floor restoration at entry, new walls and ceilings with finish work, addition of study rooms and children's activity area, room signage, accessible restrooms, stair and railing modifications at all floors, and water infiltration treatment at basement walls. Exterior work consists of installing a new flagpole, exterior building signage with associated lighting, capping open lightwells, sealing gaps in existing lightwell covers, and repair of existing aluminum storefront and steel casement windows as indicated. The contract documents include four lump-sum allowances totaling $88,000: $70,000 for specialty light fixtures, $5,000 for two bronze dedication plaques, $3,000 for room signage, and $10,000 for backlit custom signage for the Children's Cubby Wall. Three alternates are identified: duct cleaning at basement, 1st, and 2nd floors; first floor main space ceiling configuration with box beams between columns; and provision of a new barn door and hardware versus repair of an existing pocket door.

The contractor must occupy the building during construction and coordinate with Shreve Memorial Library on site access and hours. Contractor must comply with non-smoking restrictions within 25 feet of building entrances. Payment follows AIA Document G702 and G703 standards with monthly progress payments. A Clear Lien Certificate filed with Caddo Parish Clerk of Court is required at least 45 days after substantial completion before final payment is issued. Wayne Lupo, Superintendent of Facilities, serves as the Owner's Representative (318-226-5885; wlupo@shreve-lib.org). A separate furniture package contract will be issued and integrated upon substantial completion.

Opportunity text

The Work of Project is defined by the Contract Documents and consists of Interior and Exterior Improvements to the existing building as follows: Renovation of the 1st, 2nd, and basement levels of the existing 4-story historic Shreve Memorial Downtown Branch Library. Work includes new walls, ceilings, and finishes. Terrazzo Floor Restoration at Entry; addition of study rooms and Childrens activity area; room signage; accessible restrooms; and stair and railing modifications at all floors. Interior work also includes water infiltration treatment at basement walls. Exterior work includes installation of a new flagpole; exterior building signage and associated lighting; capping open lightwells and sealing gaps in existing lightwell covers; and repair of existing aluminum storefront windows and steel casement windows as indicated.

Files

File Type Posted
Specification (2).pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity