Rehabilitate Runway 11-29
Closed State & local contract opportunity Posted
- Solicitation number
- AIP 3-06-0367-021-2026
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Marina is requesting sealed bids for the rehabilitation of Runway 11-29 at Marina Municipal Airport under AIP 3-06-0367-021-2026, with bids due August 11, 2026 at 2:00 p.m. at Marina Municipal Airport Administration Building, 781 Neeson Road, Marina, California. Bidders must hold either a Class A or C-32 California contractor license at time of bid submission; failure to hold the required license renders the bid non-responsive.
The scope includes full-length, full-width surface rehabilitation of Runway 11-29, encompassing airfield safety and security measures, construction site environmental compliance, removal of existing pavement markings, crack filling and sealing, application of asphalt emulsion seal coat, and application of new pavement markings. The project must be completed within seven working days from the Notice to Proceed, with liquidated damages of $2,000 per calendar day for delays exceeding the seven working day period.
Each bid must be accompanied by a bid bond or cashier's or certified check equal to ten percent of the bid amount, payable to the City of Marina. Bidders must be pre-qualified and submit evidence of competency and financial responsibility at time of bid opening. Bid withdrawal is prohibited for ninety days following bid opening.
A non-mandatory pre-bid conference and project walk-through will be held at 10:00 a.m. on July 28, 2026 at the same location. Bidding documents are available for download from the City website at https://www.cityofmarina.org/bids.aspx or in hard copy for a non-refundable fee of $50.00 per set plus $5.00 mailing charge. Interested parties should contact Marina Municipal Airport at (831) 582-0102 or Morduno@cityofmarina.org to be added to the plan-holder list.
Opportunity text
The work includes furnishing all labor, materials, equipment, and performing all work necessary and incidental to the construction of the project known as Rehabilitate Runway 11-29 project, AIP 3-06-0367-021-2026, according to drawings and specifications as prepared by the City of Marina and according to the Contract Documents. In general, the project includes the rehabilitation of the full-length, full-width surface of Runway 11-29. The scope of actual construction work includes: Airfield safety and security, Construction site environmental compliance, Remove pavement markings within the area of work, Crack fill and seal, Apply an asphalt emulsion seal coat, and Apply new pavement markings.
Files
| File | Type | Posted |
|---|---|---|
| Rehabilitate Runway 11-29.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity