Keller 2026 Sanitary Sewer Replacement

Closed State & local contract opportunity Posted

Solicitation number
26-011
State
Texas
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Waller County, Texas is requesting bids for reconstruction of Adams Flat Road from FM 359 to Wilson Road, with proposals due August 6, 2026. The project spans approximately 1.86 miles of rural two-lane asphalt roadway with open-ditch drainage.

The scope requires one contractor to furnish all materials, supplies, equipment, tools, services, labor, and supervision. Pavement reconstruction includes a 3-inch hot-mix asphalt surface course, 10-inch flexible base, and 8-inch cement-treated subgrade, all in accordance with geotechnical recommendations and County requirements. The roadway design consists of two 11-foot travel lanes (22 feet total pavement width) with 2-foot shoulders and berms on each side. Drainage work encompasses roadside ditch grading, driveway culvert replacements, cross culvert improvements, driveway tie-ins, safety end treatments, and guardrail improvements. The contractor must maintain existing private driveway access during construction to the extent practical through temporary access provisions, phased culvert construction, and traffic control measures. The scope also includes permanent signing, pavement markings, storm water pollution prevention, erosion control, seeding and hydro mulch application, and final site restoration.

No contract value, contract term, set-aside or preference program, incumbent contractor, evaluation criteria, pre-bid meeting date, or question deadline is specified in the available materials.

Opportunity text

2 versions

Update #2 · Latest ·

Keller 2026 Sanitary Sewer Replacement.

Update #1 ·

Scope: It is the intent of Waller County to contract with one (1) vendor for all materials, supplies, equipment, tools, services, labor, and supervision necessary to complete the reconstruction of Adams Flat Road from FM 359 to Wilson Road, for an approximate project length of 1.86 miles. The proposed improvements include reconstruction of the existing two-lane asphalt roadway while maintaining the rural open-ditch drainage system within the existing right of-way. The proposed roadway section generally consists of two (2) 11-foot travel lanes for a total pavement width of 22 feet, with 2-foot shoulders/berms on each side. The pavement reconstruction includes a 3-inch hot-mix asphalt surface course, 10-ince flexible base, and 8-inch cement-treated subgrade in accordance with the geotechnical recommendations and applicable County requirements. The drainage scope includes roadside ditch grading, driveway culvert replacements, cross culvert improvements, driveway tie-ins, safety end treatments, guardrail improvements, and related grading adjustments to maintain positive drainage along the corridor. Existing private driveway access will be maintained during construction to the extent practical. Temporary driveway access, phased culvert construction, and traffic control measures will be provided as needed to support construction operations and maintain public safety. Traffic control, permanent signing and pavement markings, storm water pollution prevention, erosion control, seeding/hydro mulch, and final site restoration are included as part of the project scope.

Files

File Type Posted
03 - Notice to Bidders.pdf PDF
B26-011.Reconstruction Adams Flat Road.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity