About this opportunity

The City of Springfield, Illinois, Department of Public Utilities (City Water, Light and Power) is requesting sealed bids for installation of a 24-inch line stop on an existing cast iron transmission water main under pressure along the 10th Street railroad corridor, with bids due September 17, 2026 at 3:00 p.m. This is a re-bid. The project is subject to prevailing wage requirements under the Illinois Prevailing Wage Act (wages determined by the Illinois Department of Labor for Sangamon County) and local labor requirements mandating 50 percent city resident work hours. MBE participation goal of 11 percent and FBE participation goal of 7 percent apply.

The scope requires installation of a 24-inch line stop with epoxy-coated carbon steel sleeve and stainless steel hardware on a cast iron main installed circa 1920, currently operating at 50–70 psi. The contractor shall leave the line stop in place during City Water, Light and Power personnel dewatering and installation of a 24-inch butterfly valve (anticipated 1–2 days), then recover the line stop and install a completion plug. The proposal must include detailed material specifications, fitting and installation requirements, equipment and field procedures, a scope of work with completion schedule, descriptions of any City personnel services required, project personnel resumes, and references from similar projects. Bidders must certify 10 consecutive years of experience performing line stop work on 24-inch or larger under-pressure potable water transmission mains; subcontractors are not permitted. Insurance requirements are workers' compensation (statutory), employer's liability ($1 million), comprehensive automobile liability ($1 million), and comprehensive general liability ($1 million). The bid must be a lump sum with no additional charges permitted. Questions are due September 7, 2026. No pre-bid meeting or site visit is required. Evaluation considers proposed work, project understanding, total cost, relevant experience, references, and contractor availability to meet schedule.

Opportunity text

The scope of work for this proposal is to provide a 24 line stop on an existing cast iron transmission water main under pressure. The line stop will be installed along the 10th Street railroad corridor between Griffiths and Ridgely Ave. The line stop contractor shall leave the line stop in place during dewatering and installation of a 24 butterfly valve by CWLP personnel. The installation of the 24 valve is anticipated to take 1-2 days. Upon completion of this work the line stop will be recovered by the contractor and the completion plug shall be installed. Contractor to submit detailed specifications for all materials, fitting installation requirements, equipment and field procedures as part of their proposal. Line stop sleeve shall be epoxy coated carbon steel with stainless steel hardware or approved equal. Any work to be completed by CWLP personnel will need to be specified in the proposal submittal.