Pier Demolition - West Lake Sammamish Property

Open State & local contract opportunity Posted

Solicitation number
26091
State
Washington
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Bellevue Parks and Community Services Department is requesting bids on pier demolition at 1730 West Lake Sammamish Parkway SE in Bellevue, Washington under ITQ 26091, with bids due October 29, 2026.

The scope encompasses removal and disposal of approximately 572 square feet of existing wooden decking, a solid canopy moorage cover, and timber support pilings at the residential property. Work is performed in a single continuous stage under a lump-sum contract. The contractor must submit a Draft Waste Management Plan within seven calendar days of award notice and a Final Waste Management Plan within ten calendar days thereafter. Environmental compliance is extensive: the contractor must handle and dispose of hazardous materials in accordance with regulatory requirements, designate an on-site waste management coordinator, implement source separation for recyclable materials (wood, metals, concrete, drywall, and other specified materials), and provide copies of disposal manifests and receipts. All work must comply with the International Building Code, Washington Administrative Code Title 51, Bellevue City Code, and applicable federal, state, and local regulations.

The contractor is responsible for obtaining and maintaining all required permits, including a Demolition Permit, Hydraulic Project Approval, and Nationwide Permit 3, with potential assignment of associated fees to the owner's representative. A pre-construction conference is mandatory prior to work commencement. The contractor must submit a Critical Path Schedule, Schedule of Values, shop drawings, subcontractor lists, and material supplier lists, and participate in weekly progress meetings. Final inspection occurs upon completion with five working days' notice; contractors are required to address punch list items within 30 calendar days. A one-year guarantee period covers all work following final acceptance, during which the contractor corrects defects at no additional cost to the owner.

Opportunity text

The work shall include removal of a residential pier located at 1730 West Lake Sammamish Parkway SE,Bellevue,Washington including: Removal and disposal of approximately 572 square feet of existing wooden decking. Removal and disposal of existing solid canopy moorage cover. Removal and disposal of existing timber support pilings.

Files

File Type Posted
ITQ 26091 - Combined Specs.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity