ODR Countertop & Cabinets Replacement
Closed State & local contract opportunity Posted
- Solicitation number
- FA254326Q0035
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Buckley Space Force Base's Outdoor Recreation facility is soliciting bids for countertop and cabinet replacement at Building 1022 under a Total Small Business Set-Aside, with proposals due September 16, 2026. Only qualified small businesses are eligible to bid under NAICS code 236220 (Commercial and Institutional Building Construction).
The scope involves complete demolition of the existing front desk and single-phase installation of a new ADA-compliant L-shaped reception counter with a seamless 100% acrylic surface featuring two 42-inch-high caps and one 30-inch-high accessible section. The rear storage system includes three tiers: lockable lower cabinets, a middle whiteboard layer, and open overhead shelving. The contractor will also install two ski desks, route electrical conduits, and complete plumbing utility hookups. Work must proceed without disruption to ongoing facility operations.
The facility is located in Boulder County, Colorado. No contract value, contract term, incumbent contractor, evaluation criteria, or question deadline are specified in the posted materials.
Opportunity text
Total Small Business Set-Aside, 236220 - Commercial and Institutional Building Construction. The Buckley SFB Outdoor Recreation (ODR) facility (Bldg. 1022) is upgrading its reception area to improve service delivery and organizational workflow. This project involves the complete demolition of the existing front desk and the single-phase installation of a new, ADA-compliant L-shaped front counter paired with a structured, three-tiered back-wall storage system. The upgraded reception counter features a durable, seamless 100% acrylic surface with two 42-inch high caps and a 30-inch high accessible section, while the rear storage unit integrates lockable lower cabinets, a middle whiteboard layer, and open overhead shelving. Additionally, the contractor will install two ski desks, route supporting electrical conduits, and complete necessary plumbing utility hookups without disruption to ongoing operations.
Files
| File | Type | Posted |
|---|---|---|
| Specifications_-_Front_Desk_at_Buckley_SFB_ODR.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity