ODOT Building A HVAC Controls Replacement

Closed State & local contract opportunity Posted

Solicitation number
S-73000-00017780
State
Oregon
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Oregon Department of Transportation (ODOT) is requesting bids for HVAC controls replacement in Building A at 455 Airport Road, Salem, Marion County, with responses due August 31, 2026 and bid opening on September 17, 2026 at 2:00 p.m.

The scope comprises design, installation, testing, and configuration of HVAC control equipment in accordance with manufacturers' written instructions. Building B must retain independent operation capability from Building A. Work must maintain indoor temperatures between 67.5 and 72.5 degrees Fahrenheit without disrupting climate control; if the work creates temperature variance, contractors must provide supplemental heating or cooling to maintain that range. As-built drawings, technical analysis survey, specifications, and a detailed Statement of Work are required contract documents. The project is classified under NIGP Code 031-26 for complete, automatic temperature control systems.

This is an open market purchase using intermediate procurement methods with a lump sum contract format. Electronic quotes are permitted. No contract value or term is specified in the bid notice; contractors must submit cost proposals.

A voluntary pre-bid conference will be held on September 8, 2026 at 10:00 a.m. at the project site. Amendments have been issued to correct technical documentation. Questions should be directed to Ivory Williams, purchaser, at ivory.williams@odot.oregon.gov or (503) 910-9609.

Opportunity text

Scope of Work: This Project is to update the HVAC controls to improve energy efficiency and simplify operational control of the units. Install, test, design, and configure all equipment as needed in Building A in accordance with manufacturers written instructions. Install, test, design, and configure all equipment as needed Ensure Building B has the ability to operate independently of Building A. Perform work in a way that does not affect building climate control or provide supplemental heating or cooling during this period to maintain 70 degrees + or 2.5 degrees.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity