Oaaa, 2010, 082525 jfhq controlled area remodel
Closed State & local contract opportunity Posted
- Solicitation number
- IFB1 OAAA 2027000001 2
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Kimberlie Smith kimberlie.smith@dmva.state.co.us (720) 250-1542
Updated .
About this opportunity
The State of Colorado Department of Military and Veterans Affairs is requesting sealed bids on a JFHQ Controlled Space Remodel (IFB1 2027-0001) with bids due electronically via Box.com on July 28, 2026 at 10:00 a.m., followed by virtual public bid opening at 10:05 a.m. Mandatory pre-bid conference and site tour was held July 15, 2026; attendance and signature at that conference is a qualification requirement.
Qualified bidders must meet strict criteria: not previously terminated by the State for non-performance; operating under the same business name for at least two years; demonstrating specific contracting experience on at least two similar projects each exceeding $550,000 in hard costs utilizing a Colorado office; demonstrated bonding capability up to $650,000; and assignment of at least one project team member with ICD-705 certification. All project team members must pass background checks with no criminal records or foreign citizenship permitted access to the secure facility. Colorado labor must perform at least 80 percent of the work.
The scope involves remodeling approximately 338 square feet of controlled space at the Colorado Army National Guard facility located at 6848 South Revere Parkway, Centennial, Colorado. Work includes vestibule configuration changes, rerouting of existing mechanical, electrical, and plumbing systems, installation of a new water source heat pump, and upgrades to doors and wall types. The project is subject to Buy Clean Colorado (BCCO) Act requirements for environmental product declarations with maximum global warming potential limits on eligible materials. Work must be conducted Tuesday through Friday from 6:30 a.m. to 5:00 p.m., with weekend work permitted as needed with prior approval while the facility remains operational.
The estimated project cost is $550,000. Bid bond and power of attorney or proposal guaranty must be submitted in an amount not less than 5 percent of the total bid. The awarded contractor must provide payment and performance bonds of not less than 50 percent of the contract value. Construction is targeted for August 2026 through November 2026 completion. Clarification requests were due July 17, 2026 at 2:00 p.m. Addendum 1 addressed contractor questions from the pre-bid meeting and clarified scope items, existing systems (Honeywell Notifier fire alarm, Alberio Energy Continuum HVAC controls), and contractor responsibilities for asbestos and lead testing. Davis Bacon wages do not apply.
Files
| File | Type | Posted |
|---|---|---|
| 082525 - Addendum 1 Contractor QnA Final.pdf | ||
| Bid Breakout NG Secured Area (002).docx | DOCX document | |
| 082525 JFHQ Controlled Space Remodel IFB1 2027-0001.pdf | ||
| 082525 Bid Walk Signed In.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity