About this opportunity
San Bernardino County, California is requesting bids for a 2026 Fall Pavement Rehabilitation Project with bids due June 1, 2026.
The scope encompasses header and slot grinding of existing pavement; placement of asphalt base pavement, asphalt leveling course, and asphalt rubber hot mix (ARHM) overlay; placement of portland cement concrete (PCC) pavement and sidewalk; removal and replacement of PCC curb and gutter; installation of curb ramps and detectable warning surfaces; adjustment of water valves and covers; adjustment and replacement of manhole rings, covers, and Inland Empire Utilities Agency (IEUA) manhole covers; installation of traffic signal loops; and completion of all appurtenances necessary per the contract plans and specifications.
No estimated contract value, contract term, incumbent contractor, set-asides, preference programs, evaluation criteria, pre-bid meeting date, or questions deadline are stated in the available source material.
Opportunity text
2 versions
Update #2 · Latest ·
Notice is hereby given that San Luis Obispo County Flood Control and Water Conservation District has determined that all horizontal directional drilling (HDD) subcontractors or Contractors planning to self-perform the HDD work on the Nacimiento Water Project Unit G Realignment to be undertaken by the District must be pre-qualified prior to submitting a bid on the Project.
Update #1 ·
The work to be performed under this contract consists of header & slot grinding existing pavement, placement of asphalt base pavement, placement of asphalt leveling course, placement of ARHM overlay, , placement of PCC pavement, placement of PCC sidewalk, removal and replacement of PCC curb & gutter, curb ramps, installation of detectable warning surfaces, adjustment of water valves & covers, adjustment of manhole rings & covers, replacement and adjustment of IEUA manhole covers & adjust ring, installation of traffic signal loops, and other appurtenances necessary to complete the improvements as described in the Plans and Specifications.