NCC Fowler Luthier Expansion

Closed State & local contract opportunity Posted

Solicitation number
Northampton Community College, Northampton County
State
Pennsylvania
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from pennbid.bonfirehub.com. Updated .

About this opportunity

Northampton Community College is procuring general construction services for the Fowler Luthier Expansion project located at 511 E 3rd Street, Bethlehem, Pennsylvania through a single prime contract structure via sealed bid submission through the PennBid Program. The scope of work encompasses approximately 10,363 square feet of renovation across basement and first floor levels, including selective demolition of interior walls, doors, finishes, ceilings, light fixtures, and associated mechanical, electrical, and plumbing components, followed by new construction of walls, flooring, paint, ceilings, casework, specialized finishes, and new MEP systems designed for luthier fabrication and guitar repair instruction spaces including spray booths, buffing rooms, sanding stations, and audio labs. The project must comply with the 2021 International Building Code, Pennsylvania Uniform Construction Code, and applicable fire and mechanical codes, with construction classified as Use Group B (Business) and Type 2A construction requiring fire-rated systems and full sprinkler coverage. Electronic sealed bids must be submitted no later than 10:00 AM prevailing time on May 21, 2026, with public bid opening immediately following; a mandatory pre-bid meeting and site walk-through is scheduled for May 6, 2026 at 10:00 AM at the project location, and the last day for requesting clarifications and RFIs is May 12, 2026 at 4:00 PM. Substantial completion is required by August 21, 2026 for first floor work and November 20, 2026 for basement work, with a project commencement date on or after June 8, 2026, and liquidated damages assessed at $1,000 per calendar day for failure to meet substantial completion dates and $500 per day for failure to correct punch list items beyond 30 days after certification of substantial completion.

Bidders must meet prevailing wage requirements under the Pennsylvania Prevailing Wage Act and Davis-Bacon Act and furnish performance and payment bonds each equal to 100 percent of the contract amount from a surety company appearing on the Treasury Department's Circular 570 list and authorized to conduct business in Pennsylvania; additionally, each bid must include 10 percent bid security in the form of a certified check or bid bond. Bonds must be delivered within seven days of notification of consideration of bid, and retainage may be withheld at 10 percent until substantial completion, then reduced to 5 percent with Architect approval. Contractors must verify all existing conditions and dimensions on-site prior to submission and assume responsibility for any discrepancies between drawings and field conditions. Project documents and bidding materials are available at no cost through www.PennBid.net as of April 30, 2026, and all utility shutdowns and noisy activities require Owner approval as the building will remain occupied during construction. No specific set-aside designations for disadvantaged enterprises are identified in the procurement documents, and no incumbent vendors or current contractors are listed; the contract award value is not specified in the available solicitation materials.

Opportunity text

NOTICE IS HEREBY GIVEN that Northampton Community College will receive sealed bids via the PennBid Program for the construction of the Fowler Luthier Expansion, located in the Fowler Family Southside Center, 511 E 3rd St, Bethlehem, PA 18015. Bids for all contracts shall be submitted electronically via PennBid, no later than 10:00 AM prevailing time on May 21, 2026, at which time bids will be publicly opened and displayed on PennBid. Sealed bids will be received for the following contracts: Contract #1 Single Prime - General Construction (includes Mechanical, Plumbing, Fire Protection, and Electrical Construction) Work will include demolition of select interior walls, doors, finishes, ceilings, light fixtures and associated mechanical, electrical and plumbing components. New work will include new walls, doors, flooring, paint, ceilings, casework, finishes, and associated mechanical, electrical, and plumbing work. All project documents and solicitation details will be available at no cost at www.PennBid.net on or after April 30, 2026. Questions regarding this solicitation shall be submitted via the "Questions" feature within PennBid. Last day for RFIs is May 12, 2026 by 4:00pm. Each bid shall be accompanied by bid security in an amount equal to 10% of the base bid amount in the form of a bid bond as described in the supplementary instruction to bidders. A Performance Bond and a Payment Bond in the forms provided in the Project Manual, each in an amount equal to one hundred percent (100%) of the amount of the contract, and each with satisfactory corporate surety, shall be required to be furnished by the successful Bidders prior to execution of the contracts. IMPORTANT: Surety companies executing BONDS must appear on the Treasury Department's most current list (Circular 570 as amended) and must be authorized to transact business in the state where the PROJECT is located. Bids may not be modified, withdrawn or concealed by the Bidder for sixty calendar (60) days following the actual date of opening thereof, except as provided in Act No.4 (1974). However, if award of contract is delayed by the required approval of another government agency, the sale of bonds or the award of grants or grant, the Bids may not be withdrawn by the Bidder for a period not to exceed 120 days from the date of bid opening in accordance with Pennsylvania law. The Owner reserves the right in its discretion to reject any or all bids or parts thereof and to waive any irregularities, informalities, defects, errors or omissions in any bid. There is a mandatory pre-bid meeting on May 6, 2026 at 10:00 am at Northampton Community College, Fowler Family Southside Center, with a walk thru of the site after the meeting. This project is subject to the Commonwealth of Pennsylvania, Department of Labor and Industry's Prevailing Wage Determination or the Davis-Bacon Act as amended (40 USC276a to 276a-7).

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity