The New Jersey Department of Transportation is requesting qualifications for a Design-Build contract to develop, design, install, operate, and maintain six Direct Current Fast Charger (DCFC) charging stations across Region North, with statements of qualifications due August 5, 2026. This is a two-phase best-value procurement; no more than three firms will be shortlisted to submit full proposals. Federal-aid and NEVI (National Electric Vehicle Infrastructure Formula Program) compliance requirements apply, including Buy America and Build America provisions.
Each of the six stations must deliver eight ports capable of 350 kW per port, with a minimum of four CCS1 connectors and four NACS ports fully compliant with NEVI's current guidance, final rules, and FHWA provisions. Stations are located within three development zones (A, B, C) covering Bergen, Warren, Hunterdon, Essex, Sussex, Somerset, Hudson, Morris, Middlesex, Union, and Passaic counties; one station is required in each zone, and three additional stations may be placed in any of the three zones. Suitable sites must be existing or planned DCFC stations currently providing less than 175 kW per port, environmentally ready for NEPA compliance, and capable of providing Site Host/Property Owner Certification. The Design-Builder must certify NEVI and departmental compliance at each site, then operate and maintain all stations for five years following construction completion.
The estimated project cost ranges from $10 million to $13 million on a lump-sum basis with periodic payments. Prequalification is mandatory: Construction Work Classification 5, 7, or 44 with minimum project rating of $10,000,001; Design prequalification at H-1 Level A and T-1 Level A. Surety letters demonstrating bonding capacity for proposal, performance, and payment bonds are required. Questions are due July 27, 2026. Shortlist announcement is August 20, 2026; proposals are due October 22, 2026; best-value selection occurs in November 2026 with anticipated award in December 2026. Shortlisted firms not selected will receive a proposal stipend. GFT Infrastructure, Inc. and HNTB Corporation are prohibited from participating due to conflicts of interest.
Opportunity text
The work envisioned for this project will consist of the development, planning, design, installation, operations and maintenance to upgrade 6 suitable Direct Current Fast Charger (DCFC) Charging Stations in Region North, with each DCFC Charging Station to provide 8 ports capable of providing 350kW per port. Suitable DCFC Charging stations are 1) planned or operating DCFC Charging stations that provide less than 175kW per port, 2) environmentally ready for NEPA compliance, and 3) ready to provide Site Host / Property Owner Certification. The Project scope of work will include but is not limited to the following: Providing a minimum of 4 Combined Charging System type 1 connector (CCS1) ports and 4 North American Charging Standard (NACS) ports, fully compliant with the National Electric Vehicle Infrastructure Formula Program (NEVI) including the most current Guidance Documents, Final Rules, Buy America provisions and all related provisions issued by the FHWA. When the Departments requirements conflict with NEVI, ensure the proposal includes the more stringent requirement. Federalaid requirements apply to this work, and all Work must meet NEVI eligibility requirements. Provide DCFC station upgrades at 6 sites: The Department has determined 3 general DCFC Development Zones under this Contract, Zones A, B, and C. Section 2.0 Project Location indicates DCFC Development Zones A, B and C. One DCFC station shall be in DCFC Development Zone A, B, and C. The other three (3) DCFC stations can be at any location within the Development Zones A, B or C. Certify that each Site complies with all NEVI and Department requirements. Upon completion of the DCFC Charging Station construction and determination by the Department that the site is complete, operate and maintain the DCFC Charging Station for 5 years in accordance with NEVI and Department requirements, including all requirements identified in this Contract. Appropriate choice of site location, not on the Departments ROW, that meets the requirements for environmental compliance, site host /property owner certification and utility readiness. Federal funding provisions related to operations and maintenance, including conformance to 2 CFR 200 and Title 23 provisions. Compliance with USDOTs adoption of USDOEs Categorical Exclusion provisions for EVSE. Buy America Build America compliance for EVSE and for Manufactured Products. New Jersey Department of Transportation National Electric Vehicle Infrastructure - North A-2 RFQ Appendix A Project Information DB-003 July 2026 Working with municipalities in accordance with their Authority Having Jurisdiction requirements for EVSE development in their locations; Working with counties and State authorities, including county conservation districts and NJDEP, to ensure all permits are obtained and provisions are adhered to. Coordinating outreach efforts with the Department and with each municipality where work is performed. Workforce development and compliance with State, local and NEVI requirements, including adherence to training per the Electric Vehicle Infrastructure Training Program (EVITP) or apprentice program approved by the US Department of Labor. Operating and maintaining DCFCs for 5 years to ensure up-time performance, customer satisfaction and reporting requirements.
Files
| File | Type | Posted |
|---|---|---|
| njdot NJDOT DB_RFQ_DB-003_NEVI - North.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity