The Ohio Department of Natural Resources (ODNR), Division of Mineral Resources Management (DMRM) is seeking a contractor to complete a comprehensive kitchenette renovation at their Central Office located at 2045 Morse Road H-2 in Columbus, Ohio. The procurement involves a full-scale renovation of the MRM H2 Kitchenette, which includes installing 4 base cabinets, 4 laminate countertops, a small sink (with optional size upgrade), plumbing connections, wall and door repairs, painting, 60 square feet of luxury vinyl tile flooring, window wall modifications, and electrical outlet installations. Additional required deliverables include installing a GE 17.7-cu ft stainless steel refrigerator with bottom freezer and an optional NewAir ice maker. The project requires precise adherence to the detailed specifications outlined in the MRM H2 Kitchenette Spec Sheet. Interested contractors must arrange a site visit through Ashley Miller at 614-265-6775 or Ashley.Miller@dnr.ohio.gov, with the proposal due date set for June 4, 2025. Potential bidders are encouraged to review the attached documentation, including room dimension specifications and photographic references, to fully understand the project scope. While no specific set-aside designations are explicitly mentioned in the documents, the procurement follows standard Ohio Department of Administrative Services (DAS) terms and conditions, which typically encourage participation from diverse vendors. The contract terms include comprehensive requirements for nondiscrimination, compliance with state and federal laws, and adherence to ethical standards. Contractors must maintain proper accounting records, comply with affirmative action programs, and ensure all work is performed within the United States. No specific budget range or award value is provided in the available documentation, and there are no indications of incumbent vendors or existing infrastructure requirements beyond the current kitchenette space. Potential contractors should carefully review the OHIO DAS TERMS AND CONDITIONS document, which outlines critical operational expectations, including potential contract renewal for up to 24 additional months, subject to funding availability and departmental discretion. The project appears to be a standard facility improvement initiative with detailed specifications and clear expectations for renovation work.
Name | Description | Size | Type (Click to sort descending) | Posted (Click to sort descending) |
|---|---|---|---|---|
OHIO DAS TERMS AND CONDITIONS.pdf | 185KB | 5/20/25 | ||
MRM H2 Kitchenette Photos.docx | 3MB | Document | 5/20/25 | |
MRM H2 Kitchenette Summary Document.docx | 13KB | Document | 5/20/25 | |
MRM H2 Kitchenette Room Dimensions.docx | 15KB | Document | 5/20/25 | |
MRM H2 Kitchenette Spec Sheet.xlsx | 10KB | Spreadsheet | 5/20/25 |