About this opportunity
The Vermont Department of Military Affairs is requesting bids on fire suppression and fire alarm system replacement at the Army Aviation Support Facility in South Burlington, Vermont, with bids due September 11, 2026.
The scope includes demolition of the existing fire suppression system in the hangar and back shop areas; installation of a new fire suppression system per drawings and specifications; demolition and removal of existing fire alarm and control wiring and devices; and installation of a new pre-action fire alarm system with fire alarm panel, detection, supervisory, trouble monitoring, and annunciation capability. Place of performance is 141 Shamrock Rd, South Burlington, Vermont (Chittenden County).
The Invitation to Bid document is referenced but the detailed specifications, contract value, contract term, evaluation criteria, and procurement timeline (pre-bid meeting, question deadline, anticipated award date) are not accessible from the source material provided. Interested bidders should contact the Project Manager directly to obtain drawings, specifications, and bid documents.
Opportunity text
Contractors are invited to bid on the Army Aviation Support Facility (AASF) Flightline Sprinkler Repair project for the Army Aviation Support Facility at 141 Shamrock Rd in South Burlington, Vermont. This project consists of but is not limited to demolition of exiting fire suppression system in the hangar and back shop areas. Installation of new fire suppression system per drawings and specifications. Demolish and remove the exiting fire alarm and control wiring and devices. Install new fire alarm control wiring and devices for a new pre-action fire alarm system. Install new Fire alarm panel with detection, supervisory, trouble monitoring and annunciation. DOCUMENTS: Bona fide Bidders may obtain drawings and specifications from Project Manager,