Mesa Drive Multi-Use Trail Extension
Open State & local contract opportunity Posted
- Solicitation number
- 10032-2
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Daniel Jordan djordan@newportbeachca.gov (949) 644-3344
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Newport Beach Department of Public Works is requesting electronic bids for the Mesa Drive Multi-Use Trail Extension project (Invitation #10032-2) under a lump-sum contract, with bids due October 21, 2026 at 10:00 a.m. PDT. All contractors and subcontractors must be registered with the California Department of Industrial Relations pursuant to Labor Code section 1725.5.
The scope encompasses mobilization and demobilization, best management practices implementation, traffic control, construction surveying and utility coordination, clearing and grubbing, removal and excavation of existing roadway improvements, asphalt concrete pavement construction, and multi-use trail construction including stabilized decomposed granite surfacing, PCC curb and gutters, decorative driveways, concrete railings, gravity walls, and decorative pilasters. The work includes utility adjustments and relocations, storm drain improvements with curb inlets and associated piping, traffic striping and signing, reconstruction of adjoining improvements along Mesa Drive, and landscaping repairs.
The estimated bid value is $1,077,000. Construction is scheduled for 60 consecutive working days beginning October 14, 2026, with liquidated damages of $2,000 per day. Bidders must provide a bid bond equivalent to 10 percent of the bid amount, along with 100 percent payment and performance bonds. The original sealed copy of the bid bond must be submitted to the City Clerk prior to bid opening.
The online question-and-answer period closed October 14, 2026 at 10:00 a.m. PDT. All bid submittals must be submitted electronically through the PlanetBids vendor portal; hard copy responses will not be accepted.
Opportunity text
The work necessary for the completion of this contract consists of mobilization and demobilization; implementing best management practices (BMP); implementing traffic control; construction surveying, staking, and survey monument restoration; distributing construction notices to affected businesses and residents; clearing and grubbing; utility company coordination and utility verification; removal and excavation of existing roadway improvements, subgrade preparation, clearing existing pavement surfaces of debris, soils, and other loose materials; construction of asphalt concrete (AC) pavement; construction of multi-use trail, including, but not limited to, demolition and removal and/or relocation of existing conflicting materials, import/export of unclassified material or fill, grading and backfill, tree and vegetation removal, construction of PCC curb and gutters, PCC and decorative driveways, stabilized decomposed granite trail, redwood header boards, concrete railings, PCC gravity walls, decorative pilasters, and roadway improvements; utility adjustments and relocations, including trench repair; relocation of private mailboxes; storm drain improvements including relocation and construction of curb inlet with local depression and associated piping; traffic striping, pavement markings, pavement markers, and curb markings; traffic signing improvements; installation of curb drains; reconstruction of adjoining improvements at properties along Mesa Drive; repairs to impacted or damaged landscaping; and all other work required by the Contract Documents.
Files
| File | Type | Posted |
|---|---|---|
| Mesa Drive Multi-Use Trail Extension.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity