Main Canal Floor Replacement 2026/2027
Closed State & local contract opportunity Posted
- Solicitation number
- MC Floor Replacement 001
- State
- Washington
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Wayne Sonnichsen wsonnichsen@roza.org (509) 837-5141
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Moxee, Washington is soliciting bids for main canal floor replacement along the Roza Main Canal, with proposals due July 30, 2026.
The scope spans approximately 14,600 feet of concrete canal floor removal and replacement, beginning at the intersection of Deeringhoff Road approximately 3.1 miles east of Moxee and continuing south and west. Work includes removal of existing 6-inch concrete lining drain pipe, installation of new 6-inch perforated PVC or HDPE drain lines connected to existing drain outlets, and poly-urea sealer coating of all joints and cracks in the new concrete.
No contract value, contract term, set-aside or preference program, evaluation criteria, incumbent contractor, pre-bid meeting, site-visit date, or questions-due deadline is specified in the source material.
Opportunity text
Directions to site: Starting at the intersection of Deeringhoff Road and the Roza Main Canal Approximately 3.1 miles east of Moxee, Washington and continuing south and west in Roza Main Canal for Approximately 14,600 feet. Work includes: remove and replace approximately 14.600 feet of concrete canal floor, remove 6" concrete lining drain pipe and install new 6" perforated PVC or HDPE drain lines and connect to existing drain outlets. Coat all joints and cracks with poly-urea sealer.