Moxee.pdf

PDF 403 KB Posted

Attached to
Main Canal Floor Replacement 2026/2027
Solicitation number
MC Floor Replacement 001
Issued by
Yakima County, Washington

About this file

Summary: Moxee.pdf

This is a project description document for the City of Moxee, Washington, detailing the Main Canal Floor Replacement project scheduled for 2026/2027. The project involves the removal and replacement of approximately 14,600 feet of concrete canal floor along the Roza Main Canal, beginning at the intersection of Deeringhoff Road approximately 3.1 miles east of Moxee and continuing south and west through the canal. In addition to floor replacement, the work includes removal of existing 6-inch concrete lining drain pipe and installation of new 6-inch perforated PVC or HDPE drain lines connected to existing drain outlets. All joints and cracks in the new concrete will be sealed with poly-urea sealer to ensure durability and water resistance.

The document provides essential project specifications and scope parameters for bidders preparing responses to this infrastructure improvement contract. No specific response dates, bid due dates, site visit requirements, or bidders' conference information is detailed in the file summary provided. Similarly, contract award dates, pricing terms, set-asides, incumbency status, or funding sources and amounts are not specified in the available project documentation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .