Madera Canyon, Medium Wash and Florida Wash Bridge Replacements
Closed State & local contract opportunity Posted
- Solicitation number
- IFB-2600012737
- State
- Arizona
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Judy Cooper judy.cooper@pima.gov (520) 724-3727
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Pima County, Arizona is soliciting bids on the Madera Canyon bridge replacement projects — Medium Wash Bridge and Florida Canyon Wash Bridge — with bids due August 4, 2026. Both projects involve removal of existing concrete slab bridges, construction of new Superbox bridges, slope protection, and related site work; the Florida Canyon project additionally requires a detour to maintain Madera Canyon Road traffic during construction.
The Medium Wash Bridge Replacement includes excavation, rip rap, replacement of a corrugated metal pipe culvert with reinforced concrete pipe, guardrail, landscaping, and concrete work. The Florida Canyon Wash Bridge Replacement encompasses a concrete retaining wall, pavement markings, guardrail, rip rap, excavation, and landscaping in addition to the bridge structure and detour. Both projects carry federal identification numbers (Medium Wash: PPM-0(274)C; Florida Canyon: PPM-0(273)C) and ADOT TRACS numbers (T054101C and T054001C respectively), indicating state and federal involvement in funding or oversight.
The IFB document (2600012737) is attached and posted as of July 11, 2026. Place of performance is Madera Canyon, Pima County. A detailed bid package, including specifications, site conditions, traffic control requirements, environmental constraints, and contract terms, is available in the attached IFB document. Bidders should review the full solicitation for scope details, material standards, scheduling requirements, and any bonding or insurance conditions applicable to bridge construction in the Madera Canyon area.
Opportunity text
The Medium Wash Bridge Replacement project consists of removing the existing concrete slab bridge, constructing a new Superbox bridge, slope protection, and replacing the existing corrugated metal pipe culvert with a new reinforced concrete pipe culvert. This project includes, but is not limited to, concrete, rip rap, excavation, landscaping, and guardrail. The Florida Canyon Wash Bridge Replacement project consists of constructing a detour to carry Madera Canyon Road traffic around the Florida Canyon and Medium washes, removing the existing concrete slab bridge, constructing a new Superbox, concrete retaining wall, and slope protection. This project includes, but is not limited to, concrete, guardrail, rip rap, pavement markings, excavation, and landscaping.Medium Wash Bridge: Federal ID No.: PPM-0(274)C; ADOT TRACS No.: T054101C Florida Canyon Wash Bridge: Federal ID No.: PPM-0(273)C; ADOT TRACS No.: T054001C
Files
| File | Type | Posted |
|---|---|---|
| IFB-2600012737 Madera Canyon Bridge Replacements.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity