Lynbrook Road Water Main Rehabilitation Project

Closed State & local contract opportunity Posted

Solicitation number
Pare Project No. 08176.35
State
Massachusetts
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Town of Southborough Department of Public Works is soliciting sealed bids for the Lynbrook Road Water Main Rehabilitation Project, a CIPP structural lining installation within existing 12-inch asbestos cement piping, with bids due August 11, 2026 at 11:00 a.m. and a non-mandatory pre-bid conference on July 21, 2026 at 10:00 a.m. at the Public Works office, 147 Cordaville Road.

The scope spans approximately 1,950 linear feet of CIPP lining from the intersection of Lovers Lane and Lynbrook Road southwest to the cul-de-sac at Lynbrook Road's end, then north through a 20-foot-wide easement on the western portions of 49 Lynbrook Road and 164 Main Street, terminating at Main Street (Route 30). The project includes four stream crossings, one culvert crossing, service connections, appurtenances, and site restoration. The contract requires substantial completion 16 weeks after Notice to Proceed and final completion 30 days thereafter. Work anticipated in 2026 may include scope expansion through open-cut installation of 12-inch ductile iron water main down Lovers Lane depending on awarded contract value and town budget availability. The successful bidder must assign an on-site construction supervisor with at least 10 years' experience in potable water system infrastructure installation and provide references from at least three similar projects. Work within the Massachusetts Department of Transportation right-of-way must be coordinated with MassDOT and completed during nighttime, off-peak traffic hours. Prevailing wage rates as determined by the Massachusetts Commissioner of Labor and Industries apply.

Bid security of 5 percent of the bid price is required as a bid bond, certified check, or treasurer's/cashier's check. Performance and payment bonds equal to 100 percent of the contract sum are mandatory. Comprehensive general liability insurance must meet minimum limits of $1 million per person / $1 million per occurrence for bodily injury and $1 million per occurrence / $2 million aggregate for property damage; comprehensive automobile liability of $1 million per person / $1 million per accident for bodily injury and $1 million per accident for property damage; and workers' compensation as required by Massachusetts law. Liquidated damages are $2,000 per calendar day for delays beyond substantial completion; early completion bonuses of $500 per day are available up to a maximum aggregate of $10,000. Retainage of 10 percent of progress payments is held and released after final inspection and acceptance.

Opportunity text

The project includes the installation of approximately 1,950 linear feet of cured-in-place pipe (CIPP) structural lining inside the existing 12-inch asbestos cement (AC) piping that runs from the intersection of Lovers Lane and Lynbrook Road, extends southwest to the cul-de-sac at the end of Lynbrook Rd, then extends north through the existing 20 foot wide easement on the western portion of the properties located at 49 Lynbrook Rd and 164 Main St. then terminates at Main St.

Files

File Type Posted
260708-LynbrookRdWaterMainRehab-Specs.pdf PDF