About this file
Summary
This is a project manual and specifications document for the Town of Southborough, Massachusetts Department of Public Works, prepared by Pare Corporation. The Lynbrook Road Water Main Rehabilitation Project involves the installation of approximately 1,950 linear feet of cured-in-place pipe (CIPP) structural lining inside existing 12-inch asbestos cement (AC) piping, beginning at the intersection of Lovers Lane and Lynbrook Road and extending southwest to the cul-de-sac at Lynbrook Road's end, then north through a 20-foot-wide easement on the western portions of 49 Lynbrook Road and 164 Main Street, terminating at Main Street (Route 30). The project includes four stream crossings and one culvert crossing, with all necessary service connections, appurtenances, and site restoration work. A non-mandatory pre-bid conference is scheduled for 10:00 AM on Tuesday, July 21, 2026, at the Public Works office located at 147 Cordaville Road. Sealed bids in triplicate are due by August 11, 2026, at 11:00 AM at the Public Works office. The contract term requires substantial completion 16 weeks after the Notice to Proceed is issued and final completion 30 days thereafter. The work is anticipated to occur in 2026, with provisions for potential scope expansion through open-cut installation of 12-inch ductile iron water main down Lovers Lane depending on awarded contract value and town budget availability.
Bid security of 5 percent of the bid price is required in the form of a bid bond, certified check, or treasurer's/cashier's check payable to the Town of Southborough. The successful bidder must furnish performance and payment bonds equal to 100 percent of the contract sum. Comprehensive general liability insurance is required with minimum limits of $1,000,000 per person/$1,000,000 per occurrence for bodily injury and $1,000,000 per occurrence/$2,000,000 aggregate for property damage; comprehensive automobile liability insurance with $1,000,000 per person/$1,000,000 per accident for bodily injury and $1,000,000 per accident for property damage; and workers' compensation insurance as required by Massachusetts law. Liquidated damages are assessed at $2,000 per calendar day for delays beyond the substantial completion date, while early completion bonuses of $500 per day are available up to a maximum aggregate of $10,000. Retainage of 10 percent of progress payments will be held and released after final inspection and acceptance. Prevailing wage rates as determined by the Massachusetts Commissioner of Labor and Industries apply. The successful bidder must assign an on-site construction supervisor with at least 10 years' experience in potable water system infrastructure installation and demonstrate qualifications through submission of references from at least three similar projects. Work within the state right-of-way must be coordinated with the Massachusetts Department of Transportation and completed during nighttime, off-peak traffic hours.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Town of Southborough, MA Lynbrook Road Water Main Rehabilitation Project
Prepared for:
Town of Southborough Department of Public Works
147 Cordaville Road Southborough, Massachusetts 01772
Prepared by:
Pare Corporation 8 Blackstone Valley Place
Lincoln, RI 02865
July 2026
PROJECT MANUAL AND SPECIFICATIONS
Pare Project No. 08176.35 oestrada Image
TOWN OF SOUTHBOROUGH, MA
LYNBROOK ROAD WATER MAIN REHABILITATION PROJECT
TABLE OF CONTENTS
DIVISION 0 - BIDDING AND CONTRACT REQUIREMENTS
SECTION TITLE
00020 Invitation to Bid 00100 Information for Bidders 00310 Bid Form 00400 Supplements to Bid Form 00500 Contract Agreement 00610 Bid Bond 00620 Performance Bond 00630 Payment Bond 00700 EJCDC General Terms and Conditions 00800 Supplementary Conditions 00820 Prevailing Wage Rates 00830 Equal Employment Opportunity Program
DIVISION 1 - GENERAL REQUIREMENTS
SECTION TITLE
01010 Summary of Work 01040 Construction Schedules 01045 Cutting, Coring, and Patching 01050 Field Engineering 01060 Permits and Regulatory Requirements 01065 Project Safety and Health Specifications 01090 Reference Standards 01100 Miscellaneous and Special Project Requirements 01110 Environmental Protection Procedures 01115 Emergency Response Plan Requirements 01150 Measurement and Payment 01200 Meetings 01300 Submittals 01370 Schedule of Values 01400 Quality Control 01400A QC Attachment A 01500 Temporary Facilities 01501 Weather Protection Standard 01510 Protection of Existing Facilities 01540 Security 01570 Traffic Regulation 01600 Material and Equipment 01630 Substitutions 01631 Use of Other than First Named Manufacturers
LYNBROOK ROAD WATER MAIN REHABILITATION PROJECT
01650 Contract Closeout 01800 Maintenance
DIVISION 2 - SITE CONSTRUCTION
SECTION TITLE
02140 Dewatering 02160 Excavation Support 02200 Earthwork 02211 Rock Removal 02370 Stormwater Pollution Prevention 02513 Hot Mix Asphalt Pavement 02616 Ductile Iron Pipe and Fittings 02640 Valves, Tapping Sleeves, and Appurtenances 02643 Water Service Lines 02650 Relocation of Existing Utilities 02704 Pipeline Pressure, Leakage, and Disinfection 02733 Cured-In-Place Pipe (CIPP) Lining 02823 Asbestos Cement Pipe 02900 Landscaping
APPENDICES
Appendix A Boring and Probe Logs
LYNBROOK ROAD WATER MAIN REHABILITATION
DIVISION 0
BIDDING AND CONTRACT REQUIREMENTS
SECTION 00020 INVITATION TO BID
INVITATION TO BID
Town of Southborough, MA Section 00020 Page 1 of 5 Lynbrook Road Water Main Rehabilitation July 2026
NOTICE TO BIDDERS
TOWN OF SOUTHBOROUGH, MASSACHUSETTS
DEPARTMENT OF PUBLIC WORKS
Sealed bids will be received by the Department of Public Works of the Town of Southborough for the Lynbrook Road Water Main Rehabilitation Project. The project includes the installation of approximately 1,950 linear feet of cured-in-place pipe (CIPP) structural lining inside the existing 12-inch asbestos cement (AC) piping that runs from the intersection of Lovers Lane and Lynbrook Road, extends southwest to the cul-de-sac at the end of Lynbrook Road, then extends north through the existing 20-foot-wide easement on the western portion of the properties located at 49 Lynbrook Road and 164 Main Street, then terminates at Main Street (Route 30). There are four stream crossings located within the existing routing of this water main, and one culvert located on Lynbrook Road, and the other three are located within the easement on the western portions of 49 Lynbrook Road and 164 Main Street. All necessary service connections, appurtenances, and site restoration work will be done in accordance with the attached plans and specifications.
Depending on the awarded contract value and what the Town of Southborough has budgeted for this project, the scope of work could expand through open-cut installation of 12-inch ductile iron water main heading south down Lovers Lane beginning at the existing 12-inch gate valve near CIPP structural lining pit No. 6. The installation distance down Lovers Lane will depend on the remaining project budget to be discussed with the Contractor awarded the project.
Final bids will be received (in Triplicate) at the Public Works office, 147 Cordaville Road (Route 85) until August 11, 2026, at 11:00 am at which time they will be publicly opened and read. All bids shall be delivered in sealed envelopes with the project title clearly printed on the outside as such:
Lynbrook Road Water Main Rehabilitation Project
Prospective Bidders are asked to attend a non-mandatory Pre-Bid Conference at 10:00 AM on Tuesday, July 21, 2026, to be held at the Public Works office, 147 Cordaville Road (Route 85).
Wage rates have been determined by the Commissioner of Labor and Industries under the provisions of Massachusetts General Laws Chapter 149, Sections 26 to 27F and shall be made part of this contract.
Each bid shall be accompanied by a bid deposit in the amount of 5% of the bid price and in the form of a bid bond, certified check, or a treasurer’s or cashier’s check issued by a responsible bank or trust company, payable to The Town of Southborough in accordance with the Massachusetts General Laws Chapter 30, Section 39M. Each bid shall include a statement of non-collusion and a statement of payment of State Taxes in accordance with Massachusetts General Law Chapter 62C, Section 49A.
Bid forms may be obtained at Pare Corporation’s office, or via email from kiskierski@parecorp.com, Monday through Friday from 8:00 AM to 4:00 PM. All proposals shall be clearly marked on the outside as to the nature of the bid. The Board of Selectmen, the awarding authority, reserves the right to reject any and all bids, wholly or in part, or to accept any bid or portion thereof deemed to be in the best interest of the Town.
Kathryn Cook, Chair Andrew Dennington, II, Vice Chair
Town of Southborough, MA Section 00020 Page 2 of 5
Sam Stivers Alfred Hamilton Marguerite Landry Board of Selectmen William Cundiff, Superintendent of Public Works
INFORMATION FOR BIDDERS
General: The foregoing Notice to Contractors, a copy of which has been published or posted according to law, and the “General Requirements and Covenants”, under Division I of the Massachusetts Highway Department’s “Standard Specifications for Highways and Bridges” 1988 Edition as amended, shall constitute the “Instructions to Bidders”.
Receipt and Opening of Bids: The Department of Public Works of the Town of Southborough will receive bids at its office, 147 Cordaville Road, Southborough, MA until the date and time stated in the advertisement, at which time they will be publicly opened and read.
Contract Documents: Contract Documents may be obtained at Pare Corporation’s office, or via email from kiskierski@parecorp.com, Monday through Friday from 8:00 AM until 4:00 PM.
Deposit on Documents: There will be no deposit on documents taken.
Questions Regarding Documents: Any information given to bidders other than by means of these specifications, including addenda, as described below, is given informally, for the information and convenience of the bidders only and is not guaranteed.
In order to receive consideration of any question(s) regarding these documents, such questions shall be submitted in writing addressed to the Pare Corporation, 8 Blackstone Valley Place, Lincoln, RI 02865, Attn. Karen Iskierski or by email to kiskierski@parecorp.com and to be given consideration shall be received by the end of the business day at 4:00 pm on July 28, 2026, prior to the date of the bid opening.
If, in the opinion of the Superintendent of Public Works, such questions are appropriate and clarification is necessary, the Superintendent shall issue addenda and forward copies of the addenda to all prospective bidders known to have taken out contract documents.
Blank Form for Bid: All bids must be on the blank form contained within this document. Each bidder must state the proposed price of each item of work, both in words and figures, and all multiplications shall be carried out. Each bid shall be signed by the bidder and shall state his title and business address.
References: The contractor shall provide at least three (3) references, along with name and contact information, for projects of similar scope and size.
Town of Southborough, MA Section 00020 Page 3 of 5
SPECIAL CONDITIONS
Bidders to Investigate: Bidders must satisfy themselves by personal examination of the work and by such other means as they may wish as to the actual conditions there existing, the character and requirements of the work, the difficulties attendant upon its execution, and the accuracy of all estimated quantities stated in the bid.
Bid Security: Each bid shall be accompanied by a bid deposit in the amount of 5% of the bid price and in the form of a bid bond, certified check, or a treasurer’s or cashier’s check issued by a responsible bank or trust company, payable to the Town of Southborough, in accordance with Massachusetts General Laws, Chapter 30, Section 39M.
Bid deposits will be returned to all except the three lowest bidders within 5 days after the opening of bids, Saturdays, Sundays, and Legal Holidays excluded. Bid deposits of the 3 lowest bidders will be returned promptly after the owner and the accepted bidder have executed a contract. If the accepted bidder fails or refuses to execute the contract or supply required bonds, he shall forfeit to the owner the bid deposit with his bid.
Performance Bonds: The contractor shall furnish surety bonds as security for faithful performance of this contract and for payment of all persons performing labor and furnishing materials in connection with this contract. Each bond shall be in an amount equal to 100 percent of the accepted bid.
Laws and Regulations: The contractor shall keep himself fully informed of all Federal, State and Local laws, ordinances, rules, and regulations affecting any portion of the work under this contract and they will be deemed to be included in the contract as though they were written out in full.
Supervision of Work: The contractor shall give the work the constant attention necessary to ensure orderly progress thereof and shall cooperate in every way possible with representatives of the Town of Southborough. The contractor shall assign a superintendent or other such person capable of understanding and carrying out the terms of this contract and shall keep representatives of the Town of Southborough fully informed as to this assignment and where such person may be contacted.
Insurance: Before starting and until completion of the contract, the contractor shall procure, deposit, and maintain with the owner, insurance satisfactory to the owner, as follows:
A. Workman’s Compensation and Employer’s Liability Insurance, as required by the Workman’s Compensation Law of the Commonwealth of Massachusetts.
B. Comprehensive General Liability Insurance covering Bodily Injury and Property Damage as follows:
Bodily Injury $1,000,000 each person $1,000,000 each occurrence
Property Damage $1,000,000 each occurrence
$2,000,000 in aggregate
Town of Southborough, MA Section 00020 Page 4 of 5
C. Comprehensive Automobile Liability Insurance covering Bodily Injury and Property Damage as follows:
Bodily Injury $1,000,000 each person $1,000,000 each accident
Property Damage $1,000,000 each accident
Payroll Reports: The contractor shall furnish certified copies of any or all payrolls for the contract, showing the name, address, and occupational classification of each employee on said works, and the hours worked by, and the wages paid to each such employee. Such payroll shall also include the rates paid for rented trucks or rental equipment of any kind used on the work. This requirement shall also apply to the work for any subcontractor, having a subcontract for any of the work performed on the project. Such records shall be kept in such manner as the Attorney General shall prescribe and shall be open to inspection by the Engineer or any authorized representative of the Attorney General at any reasonable time and as often as may be necessary.
Minimum Wage Rates: The contractor shall be required to pay the minimum wage rates for the classes of labor employed as determined by the Commission of Labor and Industries of Massachusetts in accordance with Chapter 149 Sections 26 and 27. A schedule of the applicable minimum wage rates for the classes of labor employed on work covered by this contract is attached.
Work in State Roadway: Please be advised that all work within the State right-of-way will need to be completed at night during off-peak traffic hours. This work will need to be coordinated with the Massachusetts Department of Transportation.
Town of Southborough, MA Section 00020 Page 5 of 5
SPECIAL PROVISIONS
Such current amendments and addenda as may be included herewith are hereby specifically made a part of these Special Provisions as fully and to the same effect as if they had been set forth in length herein.
References in the following Special Provisions unless otherwise stated, are to the aforesaid “Standard Specifications”. In case of conflict between these Special Provisions and the aforesaid “Standard Specifications”, any amendment or addenda, these Special Provisions shall take precedence and shall govern.
The enforcement of the requirements of any of the following Special Provisions shall not be construed as waiving any of the rights of the Party of the First Part contained in any of the other provisions of the contract.
Pursuant to Massachusetts General Laws Chapter 62C, Section 49A, I certify under the penalties of perjury that I, to the best of my knowledge and belief, have filed all state tax returns and paid all state taxes required under law.
Social Security Number or Federal Identification Number Signature of Individual or Corporate Name
By:
Corporate Officer Signature (if applicable)
Print Name
The undersigned certifies under penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this paragraph, the word “person” shall mean any natural person, joint venture, partnership, corporation or other business or legal entity.
Signature of person signing bid
Print name and title of person signing bid
Company
SECTION 00100 – INSTRUCTIONS TO BIDDERS
INSTRUCTIONS TO BIDDERS
Town of Southborough, MA Section 00100 Page 1 of 4
SECTION 00100 INFORMATION FOR BIDDERS
1. PREPARATION AND SUBMISSION OF BID PROPOSAL
A. The Town of Southborough ("The Town") invites General Bids on the LYNBROOK ROAD
WATER MAIN REHABILITATION PROJECT.
B. Submit bids on the forms provided. No entries are to be made in the bound specifications. All blank spaces must be filled in, in ink or typewritten, in words and figures, and with the total of the bid proposal. Unauthorized conditions, limitations, or provisions attached to the bid will be cause for rejection of the bid.
C. Bids shall be submitted in sealed envelopes bearing on the outside the name and address of the bidder and the name of the project for which the bid is submitted, the bid number, and date and time of opening. Bids shall be submitted in Triplicate.
D. The sealed envelope containing the bid, shall be addressed to the Town of Southborough, Department of Public Works, 147 Cordaville Road, Southborough, Massachusetts 01772, and designated as bid for Lynbrook Road Water Main Replacement (if sent by mail, the sealed envelope containing the bid, and marked as directed above, must be enclosed in another envelope addressed to the Department of Public Works, 147 Cordaville Road, Southborough, Massachusetts 01772 and sent by registered mail). SUBMIT ONLY THE ORIGINAL SIGNED COPIES OF THE BID. NOTE: BIDS sent by registered mail, courier service, or hand-delivered must show the bid number, date, and time of opening on envelopes and outside wrappings.
E. The Town shall consider informal any bid not prepared and submitted in accordance with these provisions and shall waive any informality in or reject any and all bids. A bid may be withdrawn prior to the scheduled time for the opening of bids or authorized postponement. A bid received after the time and date specified shall not be considered. No bidder shall withdraw a bid within 60 days after the actual date of the opening. It is the Town’s intent to perform this work in 2026.
F. All defined terms herein are as set forth in the Supplementary Conditions.
2. RECEIPT OF BIDS
A. Bids shall be received by the Department of Public Works, 147 Cordaville Road, Southborough, Massachusetts 01772, at the time and date specified in the "INVITATION TO BID, NOTICE TO
CONTRACTORS."
B. The following documents must accompany all bids on the forms specified:
1. Bid Proposal
2. Supplements to the Bid Proposal
3. Bid Bond
4. Anti-Collusion Certification
5. Filing and Payment of State Taxes Certification
Town of Southborough, MA Section 00100 Page 2 of 4
3. ADDENDA AND INTERPRETATIONS
A. Interpretations of the drawings, specifications, or other contract documents shall not be made orally. Requests for such interpretations shall be in writing addressed to the Pare Corporation, 8 Blackstone Valley Place, Lincoln, RI 02865, Attn. Karen Iskierski or by email to kiskierski@parecorp.com and to be given consideration shall be received by end of business at 4:00 pm on July 28, 2026.
B. Interpretations and any supplemental instructions shall be in the form of written addenda to the specifications which will be sent by the Town to all prospective bidders not later than 3 working days prior to the date of the bid opening. All addenda issued shall become part of the Contract Documents.
C. If the interpretation involves the equality of use of products or methods, it must be accompanied by drawings, specifications, or other data to determine the quality or suitability of the product or method. In general, the ENGINEER will neither approve nor disapprove particular products prior to the opening of bids. Such products will be considered when offered by the CONTRACTOR for incorporation into the work.
4. BIDDERS TO ACKNOWLEDGE ADDENDA
A. Bidders shall acknowledge receipt of addenda to the Contract Documents on the Bid Proposal Form. Failure to acknowledge addenda shall cause the bid to be rejected.
5. ALTERNATES
A. Bidders must provide a price for any alternates listed on the Bid Proposal Form and clearly indicate whether the alternate is a cost increase (ADD) or a decrease (DEDUCT) to the Base Bid. Failure to give prices on any alternates shall result in the rejection of the bid.
6. QUALIFICATIONS OF PRIME BIDDERS
A. The Town shall make such investigations as is deemed necessary to determine the ability of the bidder to perform the work.
B. A bidder shall be required on the Bid Proposal Form to furnish evidence satisfactory to the Town that the bidder and the proposed subcontractors have sufficient means and experience in the types of work called for to assure completion of the Contract in a satisfactory manner.
C. POWER OF ATTORNEY: Attorneys-in-fact who sign Bid Bonds or Contract Bonds must file with each bond a certified and effectively dated copy of their power of attorney.
D. The successful bidder, upon failure or refusal to execute and deliver the documentation required by the Town within the time allotted by the Town after receipt of the Notice of Award, shall forfeit to the Town, as liquidated damages for such failure or refusal, the surety deposited with the bid. The Town will then proceed to terminate the Notice of Award.
Town of Southborough, MA Section 00100 Page 3 of 4
7. EXAMINATION OF DOCUMENTS AND SITE OF WORK
A. Before submitting a bid, each bidder shall examine the Drawings carefully, shall read the Specifications and all other proposed Contract Documents, and shall visit the site of the Work.
Each bidder shall be fully informed prior to bidding as to existing conditions and limitations under which the Work is to be performed and shall include in the bid a sum to cover the cost of items necessary to perform the Work as set forth in the proposed Contract Documents. No allowance will be made to a bidder because of lack of such examination or knowledge. The submission of a bid will be considered as conclusive evidence that the bidder has made such examination.
B. It is intended that all figures and dimensions on the drawings shall agree, but the Contractor shall confirm the same before commencing the work and shall report all discrepancies to the Town for adjustment. Failure to confirm the figures and dimensions before commencing the work shall render the Contractor completely responsible for rectifying the work so affected to the complete satisfaction of the Town. Cost of such work shall be at the Contractor's expense.
C. Work shown on the plans for which there are no particular specifications. or omissions from the plans and specifications of items which are obviously needed to properly perform the work, shall not relieve the Contractor or subcontractor involved from furnishing and installing same. The Contractor shall carefully review the plans for miscellaneous items not mentioned. All such work shall be performed with materials and workmanship satisfactory to the Town, at no additional expense.
8. TOWN PROCEDURES AND REQUIREMENTS FOR EXECUTION OF CONTRACT
A. Upon receipt of a "Notice of Award" from the Town, the successful bidder must contact the Department of Public Works and commence to provide the following information to the Town within a period of 10 days:
1. Certification from the Office of Equal Employment Opportunity (EEO)
2. Materials and Labor Bond
3. Performance Bond
4. Certificates of Insurance
5. Power of Attorney
6. Any other contractual documents required by the Town.
Upon completion of items 1 through 6 above, the successful bidder shall then be notified by the Town regarding execution of the contract for the project.
Work on the project must begin within 15 days after issuance of a Notice to Proceed by the Town.
Town of Southborough, MA Section 00100 Page 4 of 4
9. NOTICE OF SPECIAL REQUIREMENTS
A. Attention is particularly called to those parts of the Contract Documents, which deal with the following:
1. Non-Collusive Affidavit
2. Insurance Requirements
3. Wage Rates
4. State Certifications
5. Federal Procurement Regulations
6. Minority Employment and EEO Compliance
7. Occupational Safety and Health Act (OSHA)
8. Copeland Anti-Kickback Law
9. Clean Air Act of 1970
10. Completion dates for Contract
B. The bidder is specifically advised that any person, firm, or other party to whom it is proposed to award a subcontract under this Contract must be acceptable to the Town with particular regard to these special requirements.
10. LAWS AND REGULATIONS
A. The bidder's attention is directed to the fact that all applicable state and municipal laws, orders, rules, and regulations of all authorities having jurisdiction over construction work or otherwise in the locality of the project shall apply to the Contract throughout and they will be deemed to be included in the Contract the same as though herein written out in full. However, where the drawings or specifications call for a more costly method of doing the work than is required by local law, the work is to be done as shown on the drawings or described in the specifications.
11. METHOD OF AWARD
A. The Contract shall be awarded on the basis of the lowest base bid price or the lowest combination of base bid and selected alternates that produces an amount within the limits of funds available. If at the time the Contract is to be awarded the lowest formal base bid submitted by a responsible bidder exceeds the funds available for the contract, the Town reserves the right to reject all bids.
12. TIME OF COMPLETION, LIQUIDATED DAMAGES, AND RETAINAGE
A. The Contract Agreement will include a stipulation that the Work be substantially complete 16 weeks after a notice to proceed is issued and ready for final payment 30 days after the work is substantially complete.
B. Provision for liquidated damages for this contract is established in the Contract Agreement and shall be in the amount of one thousand dollars ($1,000.00) per calendar day beyond the substantial completion date.
C. If this bid is accepted, the retainage shall be an amount equal to ten percent (10%) of completed
Work. Upon satisfactory completion of the Work, any amount retained will be paid to the Contractor.
END OF SECTION
SECTION 00310 – BID FORM
BID FORM
Town of Southborough, MA Lynbrook Road Water Main Rehabilitation
Section 00310 Page 1 of 5 July 2026
SECTION 00310 BID FORM
To: Town of Southborough Department of Public Works 147 Cordaville Road Southborough, Massachusetts 01772
Project: Department of Public Works Lynbrook Road Water Main Rehabilitation Project August 2026 Pare Project No. 08176.35
Date: _________________
Submitted by:
(Full name)
(Full address)
1.00 OFFER
Having examined the Place of the Work and all matters referred to in the Instructions to Bidders and Special Instruction to Bidders and the Contract Documents prepared by Pare Corporation, Engineer for the above mentioned project, we, the undersigned, hereby offer to enter into a Contract to perform the Work for the Price of:
(Figures)
(Total price in words) dollars, in lawful money of the United States of America.
The Owner hereby reserves the right to reject any or all bids and to select the bid that best serves the interest of the Town of Southborough.
Attention is called to information contained in Specification Section 01150, Measurement and Payment, for information concerning Bid Items.
We have included herewith, the required security deposit, Bid Bond, as required by the Instruction to Bidders.
Town of Southborough, MA Lynbrook Road Water Main Rehabilitation
Section 00310 Page 2 of 5 July 2026
2.00 EXPERIENCE/SUBMITTALS
A. The Owner may make such investigations as deemed necessary to determine the ability of the Bidder to perform the Work, and the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such bidder fails to satisfy the Owner that such bidder is properly qualified to carry out the obligations of the Contract and to complete the Work contemplated therein.
B. It is the intention of the Owner to obtain bids only from Contractors with experience in the installation of water mains and potable water systems. To be considered for this project the successful bidder shall meet the following conditions:
1. The successful Bidder shall have an on-site construction supervisor with at least 10 years’ experience in the installation of infrastructure for potable water systems.
2. In addition to a skilled construction supervisor, all personnel utilized in significant roles in this project shall be properly trained and experienced in the tasks involved in the construction of infrastructure for potable water systems.
C. Contractors shall submit with bid proposal the following, which shall become an integral part of the Bid Submission.
1) Bid Bond in the amount of 5% of the Bid;
2) Certification of State Tax filing and payment;
2) Anti-Collusion Certification; and
3) Supplements to the Bid Form - Section 00400
Attachment A: Subcontractors Attachment B: Qualifications of Bidder Attachment C: Qualifications of On-Site Construction Supervisor
D. It shall be noted that the quantities on the bid form shall in no way constitute a minimum or maximum quantity to be expected. The Owner reserves the right to remove items from the bid and to add or subtract quantities from the bid after awarding of the contract has been completed
E. Unbalanced bidding (e.g., bidding that does not reflect reasonable actual costs plus a reasonable proportionate share of the bidder’s anticipated profit, overhead costs, and other indirect costs, which the bidder anticipates for the performance of the items in question) shall not be allowed and may be cause for rejection of the bid, at the discretion of the Owner. The Owner reserves the right to make all necessary inquiries as to the balanced nature of a bid. Bidders may be required to submit information upon opening of their bid with their bid. The submission of supporting documentation on bid items shall in no way constitute acceptance of that bid item as balanced. The Owner reserves the right to make the final determination of balanced or unbalanced bids.
3.00 UNIT PRICES
3 4 5
Bid Item Description Quantity Unit Unit Bid Price Unit Bid Price in Words Total Bid Item Cost
1. Site Mobilization and Demobilization (up to 5% of base bid) 1 LS $
2. Erosion & Sedimentation Controls 1 LS $
3. Test Pits 20 CY $
4. Rock Excavation 25 CY $
5. Furnish and Install Class IV CIPP Structural Liner in 12-Inch Asbestos Cement (AC) Pipe 1,950 LF $
6. Removal and Disposal of Existing 12-Inch AC Pipe 100 LF $
7. Furnish and Install 12" Ductile Iron Water Main 200 LF $
8. Furnish and Install Ductile Iron Fittings 300 LBS $
9. Furnish and Install 12" Gate Valve and Valve Box 5 EA $
10. Furnish and Install 12" Insertion Valve and Valve Box 1 EA $
11. Furnish and Install 12" Solid Sleeve Couplings 14 EA $
12. Remove and Reset Existing Hydrant 1 EA $
13. Temporary Trench Patch Installation 100 SY $
14. Permanent Trench Patch Installation 15 TON $
15. Loam and Seed Restoration 50 SY $
16. Additional Wetland Controls Allowance 1 ALLOW 10,000.00$ Ten-Thousand Dollars and Zero Cents 10,000.00$
17. Traffic / Police Detail Allowance 1 ALLOW 10,000.00$ Ten-Thousand Dollars and Zero Cents 10,000.00$
BASE BID SUBTOTAL $
BID FORM
NOTE: THE UNIT PRICE FOR EACH ITEM MUST BE WRITTEN IN WORDS AND FIGURES. IN CASE OF DISCREPANCY, THE AMOUNT SHOWN IN WORDS WILL GOVERN.
Town of Southborough, MA Lynbrook Road Water Main Rehabilitation
Section 00310 Page 3 of 5 July 2026
Town of Southborough, MA Lynbrook Road Water Main Rehabilitation
Section 00310 Page 4 of 5 July 2026
4.00 ACCEPTANCE
This offer shall be open to acceptance and is irrevocable for ninety (90) days from the Bid closing date.
If this Bid is accepted by the Owner within the time period stated above, we will:
Execute the Agreement within fifteen (15) days of receipt of Notice of Award.
Furnish the required bonds within fifteen (15) days of receipt of Notice of Award in the form described in Information to Bidders.
Commence work within fifteen (15) days after written Notice to Proceed.
If this Bid is accepted within the time stated, and we fail to commence the Work or we fail to provide the required Bond(s), the security deposit shall be forfeited as damages to the Owner by reason of our failure, limited in amount to the lesser of the face value of the security deposit or the difference between this Bid and the Bid upon which the Contract is signed.
In the event our Bid is not accepted within the time stated above, the required security deposit shall be returned to the undersigned, in accordance with the provisions of the Instructions to Bidders, unless a mutually satisfactory arrangement is made for its retention and validity for an extended period of time.
5.00 CONTRACT TIME
If this Bid is accepted, the Bidder hereby agrees to commence WORK under this Contract on or before a date to be specified in the NOTICE TO PROCEED and to substantially complete the PROJECT 8 weeks after the NOTICE TO PROCEED, and to fully complete the PROJECT 30 days after the work is substantially complete.
6.00 ADDENDA
The following Addenda have been received. The modifications to the Bid Documents noted therein have been considered and all costs thereto are included in the Bid Price.
Addendum # Dated
Addendum # Dated
Addendum # Dated
Addendum # Dated
Town of Southborough, MA Lynbrook Road Water Main Rehabilitation
Section 00310 Page 5 of 5 July 2026
8.00 APPENDICES
Submit Documents 00400, Supplements to Bid Form, with Bid Submission.
9.00 BID FORM SIGNATURE(S)
The Corporate Seal of
(Bidder - please print the full name of your Proprietorship, Partnership, or Corporation) was hereunto affixed in the presence of:
(Authorized signing officer Title)
(Seal)
(Authorized signing officer Title)
If the Bid is a joint venture or partnership, add additional forms of execution for each member of the joint venture in the appropriate form or forms as above.
SECTION 00400 – SUPPLEMENTS TO BID FORM
SUPPLEMENTS TO BID FORM
Town of Southborough, MA Section 00400 Page 1 of 4
To: Town of Southborough Department of Public Works 147 Cordaville Road Southborough, Massachusetts 01772
Project: Department of Public Works
Lynbrook Road Water Main Rehabilitation Project August 2026 Pare Project No. 08176.35
Date: _________________
Submitted by:
(Full name)
(Full address)
In accordance with Document 00100, Information to Bidders, and Document 00310, Bid Form, we include the Supplements to Bid Form attachments listed below. The information provided shall be considered an integral part of the Bid Form. These attachments are as follows:
Attachment A: Subcontractors: Include the names of all subcontractors, including qualifications, experience, and the portions of the work they will perform.
Attachment B: Qualifications of Bidder
Attachment C: Qualifications of On-Site Construction Supervisor
Town of Southborough, MA Section 00400 Page 2 of 4
ATTACHMENT A
Herewith is the list of Subcontractors referenced in the Bid submitted by:
Bidder)
Town of Southborough (Owner) dated _____________________________ and, which is an integral part of the Bid Form.
The following work will be performed (or provided) by the following Subcontractors, and coordinated by us:
SECTION OF WORK NAME
Attach a listing of relevant qualifications and experience on similar projects.
Town of Southborough, MA Section 00400 Page 3 of 4
ATTACHMENT B
List additional Relevant Experience of firm bidding the project as it relates to project of similar nature and complexities as that proposed by the Town of Southborough. Include: project time frame, contact personnel, description, bid cost, and final project cost.
Include additional sheets if necessary.
Town of Southborough, MA Section 00400 Page 4 of 4
ATTACHMENT C
Identify proposed project on-site construction supervisor and additional detailed relevant project experience including past projects, education, references, and specific project-related training.
Include additional sheets if necessary.
SECTION 00500 – CONTRACT AGREEMENT
CONTRACT AGREEMENT
Town of Southborough, MA Section 00500 Page 1 of 3
THIS AGREEMENT is dated as of the day of in the year 2026, and executed in the Town of Southborough in the State of Massachusetts.
BETWEEN the OWNER: The Town of Southborough, by and through the Department of Public Works, hereinafter called OWNER.
and the CONTRACTOR: _________________________ (Name and Address) _________________________
The PROJECT is: Department of Public Works Lynbrook Road Water Main Rehabilitation Project Pare Project No. 08176.35 The ARCHITECT/ ENGINEER is: Pare Corporation (Name and Address) 8 Blackstone Valley Place Lincoln, RI 02865
OWNER and CONTRACTOR, in consideration of the contract sum and the mutual covenants hereinafter set forth, agree as follows:
ARTICLE 1. WORK.
1.1. The CONTRACTOR agrees to furnish all equipment, machinery, tools, and labor; to furnish and deliver all materials required to be furnished and delivered in and about the improvement; and to perform all work required for Town of Southborough, Department of Public Works, Pare Project No. 08176.35 named LYNBROOK ROAD WATER MAIN REHABILITATION PROJECT, in strict conformity with the provisions of this Contract Agreement.
ARTICLE 2. CONTRACT DOCUMENTS.
2.1. The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, Invitation To Bid (Notice to Contractors), Bid Proposal, Information For Bidders, Performance and Payment Bonds, other documents listed in this Agreement, and all Modifications issued after execution of this Agreement. These documents form the Contract and are as fully a part of the Contract as if attached to this Agreement or incorporated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations, or agreements, either written or oral.
ARTICLE 3. CONTRACT TIME.
3.1. The CONTRACTOR shall be prepared to begin the Work to be performed under this contract as set forth in the proposal within fifteen (15) calendar days after execution of the Notice To Proceed. The Work shall be prosecuted from as many different points, in such part or parts and at such time as necessary and shall be conducted in such a manner and with such materials, equipment, and labor as are necessary to ensure completion within the time set forth below. Should the prosecution of the Work for any reason be discontinued, the CONTRACTOR shall notify the OWNER at least twenty-four (24) hours before resuming
Town of Southborough, MA Section 00500 Page 2 of 3 operations.
3.2. The Work shall be substantially completed 16 weeks after a NOTICE TO PROCEED is issued and ready for final payment 30 days after the work is substantially complete.
3.3. The Contractor shall pay to the OWNER for each and every calendar day that he shall be in default in substantially completing the work within the time and specifications stipulated, the sum of two thousand dollars ($2,000.00) per calendar day unless the time and/or specifications are modified in writing by the OWNER. This sum is hereby agreed upon, not as a penalty, but as liquidated damages, which the OWNER will suffer by reason of such default. The OWNER shall have the right to deduct the amount of any such damages from any moneys due the Contractor under this Contract.
3.4. The Contractor shall be paid by the Owner for each and every calendar day preceding the date established for Substantial Completion per the Contract Documents as determined by the Engineer, the sum of five hundred dollars ($500.00) per calendar day unless the time and/or specifications are modified in writing by the OWNER. The total aggregate amount of bonus pay shall not exceed ten thousand dollars ($10,000.00).
ARTICLE 4. CONTRACT SUM
4.1. The OWNER shall pay the CONTRACTOR in current funds for the CONTRACTOR's performance of the Contract the Contract Sum of Dollars ($ ), subject to additions and deductions as provided in the Contract Documents.
ARTICLE 5. PAYMENT PROCEDURES.
5.1. CONTRACTOR shall submit Applications for Payment in accordance with the General Conditions.
Applications for Payment will be processed by the ENGINEER as provided in the General and Supplementary Conditions.
5.2. Progress Payments. OWNER shall make progress payments on account of the Contract Price on the basis of CONTRACTOR's monthly Applications for Payment as certified by the ENGINEER. All progress payments shall be on the basis of the progress of the Work measured by the schedule of values established in the General Conditions (and in the case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of values, as provided in the General Requirements. The OWNER shall retain ten percent (10%) of the progress or monthly payments claimed and pay the Contractor on or before the last day of the following month. Retainage will be released after final inspection and acceptance of the Work.
5.3. Final Payment. Upon final completion and acceptance of the Work in accordance with the General Conditions, OWNER shall pay the remainder of the Contract Price as certified by the ENGINEER as provided in said General Conditions.
ARTICLE 6. SURETY.
6.1. As security for the full and faithful performance of this contract and all the incidents thereto, the CONTRACTOR has made and furnished a contract bond with ______________________________________ as surety. Said Performance and Payment Bonds shall be equal to one hundred percent (100%) of the Contract Sum, with a Surety company registered and licensed in the Commonwealth of Massachusetts.
6.2. An original, executed copy of the surety instruments shall be submitted to the OWNER.
Town of Southborough, MA Section 00500 Page 3 of 3
ARTICLE 7. MISCELLANEOUS PROVISIONS.
7.1. Terms used in this Agreement are defined in the General Conditions and Supplementary Conditions and shall have the meanings as set forth in the General Conditions and Supplementary Conditions.
7.2. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the prior written consent of the party sought to be bound; and specifically but without limitation moneys that may become due and moneys that are due may not be assigned without prior written consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents.
7.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, its partners, successors, assigns and legal representatives in respect of all covenants, agreements and obligations contained in the Contract Documents.
ARTICLE 8. TERMINATION OR SUSPENSION.
The Contract may be terminated by the OWNER or the CONTRACTOR as provided in the General Conditions. The Work may be suspended by the OWNER as provided in the General Conditions.
IN WITNESS WHEREOF, the parties of the presents have hereunto set their names this day of A.D. 20 .
Town of Southborough
In the presence of: _________________________ By: _________________________ Department of Public Works
CONTRACTOR _________________________ By: _________________________ Title
SECTION 00610 – BID BOND
BID BOND
Town of Southborough, MA Section 00610 Page 1 of 2
KNOW ALL MEN BY THESE PRESENTS:
That we, ______________________________________________________________________,as Principal, and __________________________________________________________________________, as Surety, are held and firmly bound unto the Town of Southborough, as Oblige, in the sum of __________________________________________dollars ($_____________________________________), well and truly to paid, and for the payment of which we and each of us hereby bind our self, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
Whereas, the Principal has submitted a Bid for Lynbrook Road Water Main Rehabilitation Project, Southborough, MA.
NOW, THEREFORE, if the Town of Southborough shall accept the bid of the Principal and the Principal shall enter into a Contract with the Town of Southborough in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Town of Southborough the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Town may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force.
Town of Southborough, MA Section 00610 Page 2 of 2
IN WITNESS WHEREOF, the parties hereto have signed, sealed, and delivered this instrument at Southborough, Massachusetts, this day of 20_____.
WITNESS:
(Principal)
Name & Title
(Affix Corporate Seal)
(Surety)
Attorney-in-fact
FEIN No:
(Attach Power of Attorney to this Bond)
SECTION 00620 – PERFORMANCE BOND
PERFORMANCE BOND
Town of Southborough, MA Section 00620 Page 1 of 2
That we, ______________________________________________________________________,as Principal, and __________________________________________________________________________, as Surety, are held and firmly bound unto the Town of Southborough, as Oblige, in the sum of __________________________________________dollars ($_____________________________________), well and truly to paid, and for the payment of which we and each of us hereby bind our self, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
THIS OBLIGATION IS UPON THE CONDITION that if the person or persons designated in the contract annexed hereto as the Contractor, shall faithfully furnish, and perform everything required to be furnished and performed by them under the provisions of said Contract then this obligation shall be void; otherwise, it shall remain in full force and effect.
In the event that the said contract is abandoned by the Contractor, or the work of the Contractor is discontinued by the Town of Southborough under the provisions of the GENERAL CONDITIONS, said surety hereby further agrees that it shall, if requested in writing by the Town of Southborough, take such action as is necessary to complete said contract.
FOR VALUE RECEIVED, said surety company hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of said contract or to the work to be performed thereunder or the Contract Documents accompanying the same shall in any wise affect its obligation on this bond, and does hereby waive notice of any such change, extension of time, alteration or addition to the terms of said contract or to the work or to the specifications.
Said surety hereby certifies and affirms under the penalties of perjury that said surety is licensed by the Commonwealth of Massachusetts.
Any legal action commenced by Principal or Surety must be commenced within two (2) years from the date of final payment.
SECTION 00620 – PERFORMANCE BOND
Town of Southborough, MA Section 00620 Page 2 of 2
Southborough, Massachusetts, this day of 20_____.
SECTION 00630 – PAYMENT BOND
PAYMENT BOND
Town of Southborough, MA Section 00630 Page 1 of 2
That we, ______________________________________________________________________,as Principal, and __________________________________________________________________________, as Surety, are held and firmly bound unto the Town of Southborough, as Oblige, in the sum of __________________________________________dollars ($_____________________________________), well and truly to paid, and for the payment of which we and each of us hereby bind our self, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
THIS OBLIGATION IS UPON THE CONDITION that if the person or persons designated in the contract annexed hereto as the Contractor, and all subcontractors under said contract, shall promptly pay for all labor performed or furnished and materials used or employed in the work, all as and to the extent specified in the Massachusetts General Laws, as amended, and any authorized extension or modification to the said contract, including lumber so employed which is not incorporated in such work and is not wholly or necessarily consumed or made so worthless as to lose its identity, but only to the extent of its purchase price less its fair salvage value, and including also any material specially fabricated at the order of the Contractor or subcontractor for use as a component part of the work under said contract so as to be unsuitable for use elsewhere, even though such material has not been delivered and incorporated into such work, but only to the extent that its purchase price less its fair salvage value and only to the extent that such specially fabricated material is in conformity with the Contract Documents or any changes therein which are consigned to the Contractor or to a subcontractor who has a direct contractual relationship with the Contractor; and shall pay all sums due for the rental and hire of vehicles, steam shovels, rollers propelled by steam or other power, concrete mixers, tools and other appliances and equipment employed in such work; and shall pay the transportation charges directly related to such rental or hire and shall pay all sums due trustees or other persons authorized to collect such payments from the Contractor or subcontractor, based upon the labor performed or furnished as aforesaid for a maximum of one hundred and twenty consecutive calendar days, for health and welfare plans and other fringe benefits which are payable in cash and provided for in collective bargaining agreements between organized labor and the Contractor or subcontractors, this obligation shall be null and void; otherwise it shall remain in full force and effect.
Said surety hereby further agrees that no final settlement between the Oblige and the Principal shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
FOR VALUE RECEIVED, said surety company hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of said contract or to the work to be performed thereunder or the SPECIFICATIONS accompanying the same shall in any wise affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms on the contract or to the work or to the SPECIFICATIONS.
Said surety hereby certifies and affirms under the penalties or perjury that said surety is licensed by the State of Massachusetts.
Any legal action commenced by Principal or Surety must be commenced within two (2) years from the date of final payment.
SECTION 00630 – PAYMENT BOND
Town of Southborough, MA Section 00630 Page 2 of 2
Southborough, Massachusetts, this day of 20_____.
Engineers Joint Documents Committee Design and Construction Related Documents
Instructions and License Agreement
Instructions
Before you use any EJCDC document:
1. Read the License Agreement. You agree to it and are bound by its terms when you use the EJCDC document.
2. Make sure that you have the correct version for your word processing software.
How to Use:
1. While EJCDC has expended considerable effort to make the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .