Lift Station Replacement
Closed State & local contract opportunity Posted
- Solicitation number
- 26-CD-033
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Christina DiLeonardo-Rowan dileonardoch@pcsb.org (727) 588-6315
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Pinellas County School Board is requesting bids on removal and replacement of a sanitary lift station at Dixie Hollins High School under ITB 26-CD-033, with bids due August 31, 2026 at 4:00 p.m., and a mandatory pre-bid conference on August 12 at 9:00 a.m. at the school site. Prime contractors must hold current Florida Licensed Utility Contractor certification as a mandatory eligibility requirement.
The scope includes furnishing all labor and materials to remove and replace the lift station per drawings prepared by BCER Engineering, available at www.opengov.com. Contractors are responsible for verifying drawing dimensions and determining exact measurements for proper fit; drawings shall not be scaled. All subcontractors must be licensed within their respective trades. Contractors must demonstrate five continuous years of business under the same legal entity and documented experience with at least five comparable utility and lift station replacement projects completed within the preceding five years. Upon Owner request, contractors must provide evidence of adequate personnel, equipment, and financial resources; a workable construction schedule with manpower, materials delivery, and construction technique details; and a list of intended materials suppliers with alternates subject to approval.
The estimated contract value is approximately $485,000 with a 60-calendar-day contract period from Notice to Proceed. A 10% contingency must be added as a separate line item with no markup. Bid prices remain firm for the 60-day contract period. Bid and performance security are required. Liquidated damages are assessed at $150 per calendar day for delays beyond substantial completion. All materials and equipment carry manufacturers' standard warranties, and work is warranted defect-free for one year from final completion.
Bid evaluation occurs September 2–8, 2026. Notice of Intent to Award is due October 6, 2026, with School Board approval estimated for October 13, 2026. The District reserves the right to award by line item, section, or aggregate total and may cancel any award with 10 days' notice for cause or 90 days' notice without cause. Contractors must provide Level 2 background clearance documentation under the Jessica Lunsford Act and E-Verify registration.
Opportunity text
B. The Scope of Work to be performed under this project consists of furnishing of all labor/ materials and performing all work necessary to the completion of removing and replacing an Sanitary lift station.
C. All work described in this bid document and drawings prepared by BCER Engineering. Drawings can be obtained at www.opengov.com.
D. Dimensions on drawings shall be checked for accuracy by the Contractor. The Contractor shall determine exact dimensions for proper fit. Drawings shall not be scaled.
E. Bidders and all Subcontractors shall have the following qualifications:
1. It is mandatory that contractors bidding as prime contractors on projects for Pinellas County Schools be currently qualified on the date of opening of bids as a Florida Licensed Utility Contractor certified by the State of Florida. Contractor by providing a copy of their contractor's license, a business license for this type of work and the ability to meet the qualifications as specified in Section 1.2, "Qualifications of the Bidders."
2. Subcontractors shall be licensed within their respective trade and meet the qualifications as specified in Section 1.2, "Qualifications of the Bidders."
3. Upon the request of the Owner's representative, furnish documentation of the following:
a. That this firm has available, or can obtain, adequate personnel, equipment and financial resources to undertake and execute the contract properly and expeditiously, in accordance with the plans and specifications and in strict accord with the recognized standard of quality workmanship.
b. That this firm has a workable construction schedule with reference to number of manpower to be supplied, expected materials delivery dates and construction techniques if necessary.
c. That this firm has a list of intended materials suppliers, including alternates which shall be subject for review and approval by the Owner.
Files
| File | Type | Posted |
|---|---|---|
| Lift Station Replacement.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity