Lake Houston Pump Station Centerpoint Transformer Pad Mount Installation
Closed State & local contract opportunity Posted
- Solicitation number
- 25-0048-D
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Grady Garrow ggarrow@sjra.net (936) 588-7181
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
San Jacinto River Authority (SJRA) is requesting sealed proposals for a CenterPoint transformer pad mount installation at the Lake Houston Pump Station facility in Harris County, Texas, with proposals due August 21, 2026 at 11:00 a.m. CST, and mandatory attendance at a pre-proposal conference and site visit on August 4, 2026 at 1:00 p.m. CST at 16699 Horizon Drive, Crosby, Texas required for proposal eligibility.
The scope includes furnishing and installing a 9 feet by 11 feet concrete transformer pad; installation of removable protective barriers (11 bollards); installation of conduits and duct bank; removal of an existing light pole and associated conduits in the CenterPoint easement with conduit caps; removal of previously abandoned conduits where necessary; site restoration with hydromulch; and comprehensive coordination with CenterPoint Energy throughout the transformer installation process. The transformer itself has been previously purchased by SJRA.
Bidders must submit pricing across six line items: mobilization and demobilization, bonds and insurance, pad installation with earthwork and conduit runs, light pole removal and demolition, bollard installation (11 units), and site restoration. Proposals must include completed Attachments B–J, a Conflict of Interest Questionnaire Form, and a proposal form; all forms must be signed and complete.
The deadline for questions is August 7, 2026 at 11:00 a.m. CST. Award is anticipated for September 2026, with construction start also anticipated in September 2026. The contact is Grady Garrow, Senior Buyer, San Jacinto River Authority, 1577 Dam Site Road, Conroe, Texas 77304, (936) 588-7181 or ggarrow@sjra.net.
Opportunity text
The CenterPoint Transformer Pad Mount Installation project is located at the SJRA Lake Houston Pump Station facility. This facility consists of a Pump Station which transports raw water from Lake Houston to the SJRA Highlands Canal System, a supporting operations center, and storage buildings. The project will furnish a pad for the future installation of a CenterPoint transformer to accommodate a voltage reduction of the site. This transformer has been previously purchased by SJRA. Additionally, this project will consist of the installation of removable protective barriers surrounding the pad, installation of conduits and duct bank, removal of an existing light pole with a portion of the existing conduits in the CenterPoint easement, and installing caps for these conduits. The removal of previously abandoned conduits may be necessary as well. The contractor will be responsible for all CenterPoint Energy coordination related to the transformer installation.
Files
| File | Type | Posted |
|---|---|---|
| Bid Invitation (23).pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity