About this opportunity
The City of Chino, California is requesting bids for intersection improvements at Moonspinner Street and West Preserve Loop (Project No. TR271) under IFB# 2026-0024, with bids due October 22, 2026 at 10:00 a.m. via PlanetBids. This is a prevailing wage public works project subject to California Labor Code requirements.
The scope includes sawcutting and removal/replacement of existing concrete improvements, installation of ADA-compliant curb ramps, removal and replacement of landscaping and irrigation in conflict with the work, asphalt pavement reconstruction and cold mill overlay, furnishing and installing Rectangular Rapid Flashing Beacons (RRFBs) and audible pedestrian push button assemblies, striping and thermoplastic crosswalk markings per Caltrans current specifications, and traffic control. Work is anticipated to begin in January 2027 and must be completed within 30 working days after Notice to Proceed.
The successful bidder must hold a valid California Class A contractor's license and be registered with the State Department of Industrial Relations. Prevailing wage rates are available through the Department of Industrial Relations website or from the City. The contractor must furnish a 10% bid bond, 100% Labor and Materials Bond, 100% Faithful Performance Bond, and 10% Warranty Bond with surety companies acceptable to the City Council.
Bids remain valid for 60 days after the due date. Questions or requests for interpretation must be submitted through PlanetBids before 10:00 a.m. on October 8, 2026. No pre-bid meeting is scheduled. Bidders must submit a Non-Collusion Declaration, Certification of Non-Discrimination, Workers' Compensation Insurance Certificate, Site Examination Certificate, Labor Code Section 2810 information, Iran Contracting Act Compliance Affidavit, and a Qualification and Experience Statement documenting three similar projects completed within the past two years. The City reserves the right to reject any or all bids and award to the lowest responsive, responsible bidder.
Opportunity text
The Contractor shall supply all labor, materials, and equipment to perform the work. Work shall include but is not limited to the following: Sawcutting, removal and replacement of existing concrete improvements, installation of ADA compliant curb ramps, removal and replacement of existing landscaping and irrigation in conflict with improvements, asphalt pavement reconstruction, asphalt cold mill and overlay, furnishing and installing Rectangular Rapid Flashing Beacons (RRFBs) and audible pedestrian push button assemblies, re-installation of striping and placement of thermoplastic crosswalk markings per Caltrans current specifications, and traffic control.
Files
| File | Type | Posted |
|---|---|---|
| Intersection Improvements Moonspinner St at West Preserve Loop.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity