Installation of Electrical Heaters at 200 Frontage

Closed State & local contract opportunity Posted

Solicitation number
EV00017904
State
Massachusetts
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from procurement.boston.gov. Updated .

About this opportunity

The City of Boston is requesting sealed bids for installation of fan-forced electric heaters and supporting electrical infrastructure at 200 Frontage Road (Project EV00017904), with bids due October 6, 2026 at 12:00 PM EDT and a mandatory site visit September 15, 2026 at 9:00 AM. Electrical work is a filed sub-bid requirement with sub-bids due September 29, 2026 at 12:00 PM. This is a prevailing-wage public works project subject to Massachusetts General Law Chapter 149 and the Boston Residents and Jobs Policy.

The scope includes installation of three fan-forced electric heaters in the garage area, new electrical circuitry, a new breaker panel, and a new feed from the main switchgear to support the heaters. Technical specifications and electrical and HVAC drawings are provided as binding contract documents; Addendum No. 1 supersedes prior drawings. Contract time is 150 calendar days to substantial completion and 180 calendar days to final completion. Liquidated damages are assessed at $100 per day for failure to meet completion milestones.

A mandatory prevailing wage schedule effective September 3, 2026 (Wage Request Number 20260902163011) establishes minimum compensation rates across over 100 construction classifications, including electricians at $68.78 to $73.08 base wage, with apprentice rates and apprentice-to-journeyworker ratios specified. Contractors must post the schedule, maintain weekly certified payroll records and Statements of Compliance for three years, and ensure apprenticeship ID card compliance.

Bidders must submit a 5% bid deposit as a bid bond, cash, or certified check. The successful contractor must furnish a 50% labor and materials payment bond. Required documentation includes Certificate of Authority (CM-06), Wage Theft Prevention Form (CM-16), tax compliance certifications, debarment certifications, and acknowledgment of all addenda. Written questions are due September 18, 2026 at 12:00 PM. The City retains seven-year record retention requirements and is exempt from Massachusetts sales tax. No incumbent is identified.

Opportunity text

Install fan forced electric heaters to the garage area at 200 Frontage Rd. Install new electrical circuitry, including new breaker panel and new feed from main switchgear, to support new heaters.