I-10 Westbound Frontage Road Reclaimed Water/Wastewater Utility Adjustment

Closed State & local contract opportunity Posted

Solicitation number
CSP37-26
State
Texas
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

El Paso Water Utilities Public Service Board is requesting competitive sealed proposals for furnishing and installing reclaimed water and wastewater utility lines along the I-10 Westbound Frontage Road in El Paso, Texas, with proposals due September 16, 2026 at 1:30 p.m. Mountain Time and opening at 2:00 p.m. the same day. Service-disabled veteran business participation goals apply with good faith effort documentation required.

The scope encompasses approximately 1,425 linear feet of 24-inch diameter AWWA C200 welded steel reclaimed water line; 320 linear feet of 16-inch diameter AWWA C900 DR25 PVC sewer line; open-cut casings (50 LF of 24-inch split steel, 40 LF of 36-inch steel, 35 LF of 36-inch split steel); installation, maintenance, and removal of a temporary bypass for the existing 16-inch sewer line during tie-in; removal and disposal of existing 24-inch tape-wrapped steel reclaimed water line and 16-inch PVC sanitary sewer with fittings, valves, and concrete manholes; and an additive alternate featuring a 24-inch dual line stop with 16-inch HDPE bypass pipeline. Ancillary work includes trench safety per OSHA requirements, subsurface utility engineering, disinfection, stormwater pollution prevention, traffic control, construction water and power, dust control, project management, mobilization, demobilization, housekeeping, and project videotaping.

Minimum project-specific criteria require at least three key personnel with successful completion of at least two projects involving 1,000 linear feet or greater of 24-inch or larger pipe, two projects with 500 linear feet or greater of 16-inch or larger sewer force main, two fast-track schedule projects, and two projects with installation and removal of 20-inch or larger line stops and 16-inch or larger sewer collection system bypasses. Offerors must demonstrate financial capacity, safety qualifications, and complex utility connection experience; all determinations are pass/fail.

Evaluation allocates 40 points to total proposal price (lowest price receives maximum points), 20 points to overall experience, 10 points each to project manager and superintendent past experience, and 20 points to project approach. The successful offeror must furnish 100 percent performance and 100 percent payment bonds. Proposal security equal to 5 percent of maximum proposal price is required. A non-mandatory pre-proposal conference is scheduled for August 24, 2026 at 2:00 p.m. local time. Contract documents are available electronically via the El Paso Water EUNA Procurement IonWave e-bid website; physical copies are no longer available. Prevailing wage rates apply.

Opportunity text

Furnish and install approximately 1,425 LF of 24-inch diameter AWWA C200 Welded Steel reclaimed water line, 320 LF of 16-inch diameter AWWA C900 DR25 PVC (Green) Pipe sewer line, 50 LF of 24- inch split steel casing using open cut method, 40 LF 36-inch steel casing using open cut method, 35 LF of 36-inch diameter split steel casing, including fittings, isolation valves, tie-ins to existing reclaimed waterlines and sewer lines, by open cut method. The project also includes installation, maintenance and removal of temporary bypass for existing 16-inch sewer line during tie-in. The project includes removal and disposal of existing 24-inch tape-wrapped steel reclaimed water line and 16-inch PVC sanitary sewer, including fittings, valves, and concrete manholes. The project includes additive alternate No. 1, Furnish, install, maintain and remove 24-inch dual line stop with 16-inch HDPE bypass pipeline. The project includes trench safety per OSHA requirements, subsurface utility engineering, disinfection, storm water pollution prevention measures, project-wide traffic control, construction water and power, dust control, project management, mobilization, demobilization, house-keeping and project videotaping for a complete and operable project as intended by the drawings and specifications and other Work indicated in the Contract Documents.

Files

File Type Posted
CSP37-26 - Front Ends and Specs.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity