Harford County Library Administration Office Renovations
Closed State & local contract opportunity Posted
- Solicitation number
- 26-124
- State
- Maryland
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Karen Post kmpost@harfordcountymd.gov (410) 638-3550
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Harford County, Maryland is requesting bids on comprehensive renovations to the Harford County Library Administration Office, with bids due September 23, 2026. The scope encompasses demolition and new installation of acoustic ceiling systems, floor finishes, doors, windows, and interior walls; creation of new offices and a training room; restroom renovation; new mechanical ductwork and electrical systems with selective plumbing replacements and additions; and furnishing and installation of complete HVAC equipment with labor, materials, equipment, supervision, startup, testing, and balancing.
Seven alternates are offered for optional inclusion: aluminum storefront systems, roof hatch and ladder, fence extension, operable gate into the parking lot, new exterior hollow metal doors and frames, exterior soffit and fascia along the front building, and new glazed exterior window systems. The project operates under an alteration-work framework requiring the contractor to maintain partial owner occupancy during construction, coordinate with existing utility services, implement fire prevention and dust control measures, and protect existing materials and finishes.
Construction documents were prepared by Frederick Ward Associates, Inc., with a permit/bid construction set dated June 17, 2026 and project manual dated June 22, 2026. The contract is structured as a single prime contract with detailed specifications across multiple divisions covering general requirements, demolition, concrete, metals, wood and plastics, thermal and moisture protection, openings, finishes, specialties, furnishings, fire suppression, plumbing, HVAC, electrical, and exterior improvements. The contractor must submit a detailed submittal schedule, coordinate drawings for multi-trade integration, and maintain compliance with lead-safe work practices and fire prevention procedures for alteration projects. Payment utilizes AIA Document G702 and G703 forms with Applications for Payment submitted according to an established schedule of values.
Opportunity text
The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Demolition and new work to acoustic ceiling systems, floor finishes, doors, windows, interior walls, the installation of new offices and training room and renovation of restrooms. New mechanical ductwork and electrical systems with selective plumbing replacements and additions. 2. Furnish and install all HVAC equipment, including all labor, materials, equipment, supervision, startup and testing and balancing required for a complete and operations systems, accordance with the contract documents. 3. Add alternates to for the exterior storefront, windows, rear doors, new automatic swing gate and fencing, new soffit/fascia board and a new roof hatch and ladder.
Files
| File | Type | Posted |
|---|---|---|
| 840264librHard.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity