Government Building Hurricane Repairs and Improvements Project

Closed State & local contract opportunity Posted

Solicitation number
DB-2026-FM-107
State
Louisiana
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Calcasieu Parish Police Jury is requesting bids for hurricane repairs and improvements to its government building at 1015 Pithon Street, Lake Charles, Louisiana, with bids due October 21, 2026 at 2:30 p.m. Central Time. The pre-bid conference was held September 23, 2026; Addendum No. 1 was issued September 28, 2026 and must be acknowledged on the bid form or the bid is subject to disqualification.

The scope includes removal and replacement of exterior ACM panels; the complete exterior curtainwall system with new structural steel reinforcement; standing seam metal roofing, gutters, and downspouts; interior repairs to rooms at the exterior perimeter of floors three and four; replacement of stairwell rated ceiling assemblies and acoustical ceiling systems at stairwells 402 and 403; basement repairs; and contractor costs to remove, store, and reset all building furniture across all floors. Alternate No. 2 addresses provision of 5/8" MMR Type X Gypsum Board at floors three and four in lieu of standard 5/8" Gypsum Board.

Addendum No. 1 identifies approved manufacturers and products, including Livers Bronze Linear Railing System for exterior railings, Metpar Phenolic Partitions manufactured by Scranton Products, US Frame Factory for cold-formed exterior metal stud framing, and CertainTeed products for acoustical tile ceiling systems. The contractor must employ a Construction Materials Testing and Inspection Company at contractor expense, with all retesting costs borne by the contractor if work fails compliance. Service shutdowns — electrical, water, sewer, or other — must be scheduled with the owner a minimum of 14 days in advance and performed outside normal business hours. HVAC commissioning requirements apply, with detailed responsibilities for the general contractor, mechanical contractor, and commissioning agent regarding pre-functional checklists and functional performance testing.

The contract construction timeline is 550 calendar days from the date of Notice to Proceed. Contract documents are distributed electronically only; no paper copies are available after bidding.

Opportunity text

The Work of the Project is defined by the Contract Documents and consists of, but is not limited to, the following: a. Removal and replacement of exterior ACM panels as indicated on drawings sheet A4.0, A4.1, A4.2 and A4.3. b. Removal and replacement of all exterior curtainwall system at perimeter on building as located on the floor plans and drawing sheet A3.6 (Exterior Window Elevations) and installation of new structural steel reinforcement as shown on the Structural drawings and sheet A5.5A through A5.10B. c. Removal and replacement of standing seam metal roof, gutters and downspouts. d. Interior repairs to rooms at exterior perimeter of floors three and four as indicated on the floor plans and room finishes schedules. e. Replacement of stairwell rated ceiling assemblies and acoustical ceiling systems at stairwells 402 and 403 as detailed on drawing sheet A5.2/1 & 2, as well as cleaning, repairing and painting of existing walls and installation of new floors and rubber wall base. f. Repairs to Basement as indicated on sheet A2.0, g. Contractors cost to remove, store and reset all furniture on all floors of the building to achieve the project scope of work.