The City of Boca Raton, Florida is requesting sealed bids for the Golden Harbour Infrastructure Upgrades project under ITB, with bids due August 27, 2026 at 3:00 p.m. EDT.

The scope encompasses replacement of approximately 5,000 linear feet of water main (4 to 6 inches in diameter) along NE 5th Avenue between NE 14th Street and NE 4th Lane in the Golden Harbour neighborhood, together with abandonment of existing water mains, installation and reconnection of meters, roadway and sidewalk improvements, and stormwater collection upgrades. The contractor must furnish all labor, materials, equipment, services, and incidentals necessary for a complete and operating system, maintain water service during construction, and coordinate with city operations. All work must comply with contract documents and permit conditions, including ancillary components, testing, and restoration work as necessary.

The estimated project budget is $2 million. The work is classified under NIGP codes 3340 (General Contractor/Building Contractor) and 3550 (Utility/Underground Projects).

A non-mandatory pre-bid conference will be held via GoTo Meeting, with instructions provided in the bid documents. The public bid opening will also use the GoTo Meeting platform. Electronic bid submission is available; however, original bid security must be submitted in hard copy to the City of Boca Raton at 201 W. Palmetto Park Road, Boca Raton, Florida, in accordance with bid document instructions. Bidders must monitor the electronic bidding service at https://brpurch.ionwave.net/Login.aspx for addenda prior to submission. Bid documents are hosted on the external electronic bidding service and require registration to access.

Opportunity text

The City of Boca Raton, Florida is accepting sealed bids for the above. Project Scope: The work (Project) includes furnishing all labor, materials, equipment, services, and incidentals to replace approximately 5,000 linear feet of water main ranging in sizes from 4 to 6 in the Golden Harbour neighborhood along NE 5th Ave between NE 14th St and NE 4th Ln. Included with the water main replacement is abandonment of existing water mains, installation and reconnection of meters as well as additional civil upgrades including roadway, sidewalk and stormwater collection improvements. Furnishing all labor, materials, equipment, services, and incidentals for all scope components are required for a complete and operating system. Maintenance of water service and coordination with operations are required. All work shall comply with Contract Documents and permit conditions, and include all ancillary components, testing and restoration work, as necessary.