GA Ramp Rehabilitation Stage 2 & 3

Closed State & local contract opportunity Posted

Solicitation number
2026-0448
State
Texas
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of El Paso is requesting bids for GA Ramp Rehabilitation Stage 2 & 3 at El Paso International Airport under Bid No. 2026-0448, with proposals due August 26, 2026. The work is funded through FAA Airport Improvement Program Grant No. 3-48-0077-057-2025.

The scope encompasses ramp rehabilitation including pavement preparation and removal, excavation, crushed aggregate base course installation, asphalt mix pavement placement, drainage system installation, and miscellaneous structures such as catch basins, manholes, and concrete culverts. Work must comply with FAA General Provisions AC 150/5370-10H, Construction Safety and Phasing Plan requirements per AC 150/5370-2, and electrical requirements. The Contractor must maintain strict adherence to the Construction Safety and Phasing Plan to preserve free and unobstructed movement of aircraft in the Air Operations Area. The Resident Project Representative holds final authority over specification interpretation, material acceptability, and work quality.

The Contractor must furnish all labor, materials, equipment, and tools; establish a dedicated field office for the Engineer and RPR with utilities provided; maintain survey control points; and implement a Contractor Quality Control Program. The Owner conducts quality assurance testing at its expense using ASTM, AASHTO, federal specifications, and other standards effective on the advertisement date. Material storage, inspection, and testing requirements are detailed in the specifications. The Owner reserves the right to modify work quantities and scope within defined limits; modifications exceeding 25 percent of total contract cost or major contract items require supplemental agreements. Performance and payment bonds are required. The contract includes provisions for partial acceptance of completed usable units and comprehensive indemnification protecting the Owner from claims arising from Contractor operations or law violations.

Opportunity text

Ramp Rehabilitation Stage 2 & 3.

Files

File Type Posted
6. 2026-0448 Specifications.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity