Electric Vehicle (EV) Charging Stations - (RE-BID)
Closed State & local contract opportunity Posted
- Solicitation number
- 1332033
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Paula Duarte paula.duarte@cityofchicago.org (312) 744-7971
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Chicago Department of Fleet and Facility Management is soliciting proposals for procurement, installation, configuration, and long-term support of electric vehicle charging stations across City-owned fleet facilities, with proposals due September 28, 2026. This is a re-bid.
The scope encompasses Level 2 AC charging, Level 3 DC fast charging, and solar charging stations deployed in coordinated phases at multiple municipal facilities. Installation and implementation are guided by operational needs, site readiness, and available electrical capacity at each location. The project supports the City's current electric vehicle fleet and accommodates future fleet growth.
A 7 MB procurement document (city of chicago 1332033.pdf) is attached and contains detailed specifications, site information, technical requirements, and evaluation criteria. The City has identified multiple fleet facilities as deployment locations, though the attached document specifies which sites are included in the current phase.
No estimated contract value, contract term, evaluation weighting, incumbent contractor, question deadline, pre-bid meeting, or detailed timeline beyond the September 28 proposal due date is stated in the available source material.
Opportunity text
The City of Chicago, through its Department of Fleet and Facility Management (2FM) is actively expanding and modernizing its electric vehicle (EVSE) charging infrastructure to support a growing municipal fleet. This initiative includes the procurement, installation, configuration, and long-term support of Level 2 (L2) AC Charging, Level 3 (L3) DC Fast Charging, and Solar Charging stations at City-owned fleet facilities. Expand EVSE charging infrastructure to support the Citys current electric vehicle fleet and accommodate future fleet growth. Implement EVSE unit installations in coordinated phases, guided by operational needs, site readiness, and available electrical capacity.
Files
| File | Type | Posted |
|---|---|---|
| city of chicago 1332033.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity