Eastern Avenue Reconstruction

Closed State & local contract opportunity Posted

Solicitation number
2026-20-022-4506-938
State
Texas
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Town of Highland Park, Texas is requesting bids on Eastern Avenue reconstruction covering approximately 3,500 linear feet from the south side of Mockingbird Lane to the north side of Bordeaux Avenue, with bids due August 11, 2026.

The scope includes reconstruction of the existing 20-foot wide one-way single-lane roadway in concrete over stabilized subgrade, maintaining the existing width and configuration. Intersecting street and alley paving shall be reconstructed to the nearest joint beyond the existing concrete valley gutter or approximately 5 feet of alley entrances. The existing sidewalk will be reconstructed to meet current ADA/PROWAG criteria. Work includes approximately 450 linear feet of 8-inch waterline replacement extending from the alley between Livingston Avenue and Southern Avenue north to Mockingbird Lane. Two existing 3-foot curb inlets at the southern project limits shall be reconstructed as 5-foot long inlets. The design must comply with all current Town of Highland Park standards and applicable NCTCOG and TXDOT requirements.

The Project Manual (13 MB) contains detailed specifications, design standards, and technical requirements for bidders and contractors. No estimated contract value, contract term, incumbent, evaluation criteria, pre-bid meeting, or question deadline is identified in the posted materials.

Opportunity text

The work generally includes the reconstruction, water, and storm improvements on Eastern Avenue (from the south side of the intersection of Eastern Avenue and Mockingbird Lane to the north side of the intersection of Eastern Avenue and Bordeaux Avenue) approximately 3,500 linear feet. The existing approximately 20 ft wide one-way single lane roadway shall be reconstructed in kind, at the same width as the existing roadway. The proposed paving will be concrete over stabilized subgrade. Intersecting street and alley paving shall be reconstructed to the nearest joint beyond the existing concrete valley gutter or approximately 5 feet of the alley entrance, respectively. The existing sidewalk shall also be reconstructed and confirmed to meet current ADA/PROWAG criteria. Additionally, there will be a small amount of 8-inch waterline replacement beginning approximately at the alley between Livingston Avenue and Southern Avenue and extending north up to approximately Mockingbird Lane (~450 LF). The two existing 3-foot long standard curb inlets at the southern end of the project limits shall be reconstructed as 5-foot long inlets. The Design will meet all current Town standards and NCTCOG/TXDOT where applicable.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity